CYLINDER HEAD
5-11
•
Timing chain tensioner locknut “2”
9. Turn:
•
Crankshaft
(several turns counterclockwise)
10.Check:
•
“T” mark “a”
Align the AC magneto “T” mark with the mark
“b” on the crankcase.
Not aligned
Reinstall the camshaft sprock-
et.
Refer to the installation steps above.
11.Tighten:
•
Camshaft sprocket bolt
NOTICE
ECA13750
Be sure to tighten the camshaft sprocket
bolts to the specified torque to avoid the
possibility of the bolts coming loose and
damaging the engine.
TIP
While holding the AC magneto “1” with the rotor
holding tool “2”, tighten the camshaft sprocket
bolt.
12.Install:
•
Crankcase cover (left)
Refer to “GENERATOR” on page 5-46.
13.Install:
•
Viewer plug “1”
TIP
Align the marked line “a” on the viewer plug with
the end surface of the cylinder head rear sec-
tion.
14.Loosen:
•
Locknut (rocker arm)
•
Adjuster (rocker arm)
Refer to “ROCKER ARMS” on page 5-13.
15.Clean the mating surfaces between the cylin-
der head cover assembly and the cylinder
head.
16.Apply:
•
Sealant
(mating surfaces between the cylinder head
cover assembly and the cylinder head)
Timing chain tensioner locknut
38 Nm (3.8 m·kgf, 27 ft·lbf)
Camshaft sprocket bolt
35 Nm (3.5 m·kgf, 25 ft·lbf)
T
R
.
.
1
2
a
b
T
R
.
.
Rotor holding tool
90890-01235
Universal magneto and rotor
holder
YU-01235
Yamaha bond No. 1215
90890-85505
(Three bond No.1215®)
1
2
1
a
Содержание SR400 2014
Страница 1: ...2014 SERVICE MANUAL SR400 SR400E 2RD 28197 E0 ...
Страница 2: ......
Страница 8: ......
Страница 52: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 25 EAS20410 LUBRICATION DIAGRAMS 1 2 4 5 6 4 8 10 3 7 9 ...
Страница 54: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27 1 3 2 ...
Страница 56: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29 1 2 3 4 5 8 10 9 a b b a 6 7 ...
Страница 58: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 31 2 4 c c 3 1 ...
Страница 60: ...CABLE ROUTING 2 33 EAS20430 CABLE ROUTING Right side view ...
Страница 62: ...CABLE ROUTING 2 35 Left side front view ...
Страница 64: ...CABLE ROUTING 2 37 Left side rear view ...
Страница 66: ...CABLE ROUTING 2 39 Upper front view ...
Страница 68: ...CABLE ROUTING 2 41 Upper rear view ...
Страница 70: ...CABLE ROUTING 2 43 Headlight ...
Страница 72: ...CABLE ROUTING 2 45 Handle ...
Страница 74: ...CABLE ROUTING 2 47 Fuel tank breather hose ...
Страница 76: ...CABLE ROUTING 2 49 Fuel pump case ...
Страница 78: ...CABLE ROUTING 2 51 Throttle body upper view ...
Страница 80: ...CABLE ROUTING 2 53 Throttle body side view ...
Страница 82: ...CABLE ROUTING 2 55 Air induction system solenoid ...
Страница 84: ...CABLE ROUTING 2 57 ...
Страница 113: ...PERIODIC MAINTENANCE 3 27 1 a b ...
Страница 114: ...PERIODIC MAINTENANCE 3 28 ...
Страница 172: ...CHAIN DRIVE 4 56 ...
Страница 234: ...TRANSMISSION 5 60 ...
Страница 249: ...THROTTLE BODY 6 14 ...
Страница 250: ...AIR INDUCTION SYSTEM 6 15 EAS27040 AIR INDUCTION SYSTEM 1 2 3 4 5 1 2 3 4 5 ...
Страница 254: ...AIR INDUCTION SYSTEM 6 19 ...
Страница 257: ......
Страница 265: ...CHARGING SYSTEM 7 8 3 AC magneto 4 Rectifier regulator 5 Battery 6 Main fuse 36 Frame ground ...
Страница 267: ...CHARGING SYSTEM 7 10 ...
Страница 277: ...SIGNALING SYSTEM 7 20 ...
Страница 303: ...FUEL INJECTION SYSTEM 7 46 ...
Страница 307: ...FUEL PUMP SYSTEM 7 50 ...
Страница 308: ...ELECTRICAL COMPONENTS 7 51 EAS27973 ELECTRICAL COMPONENTS 11 9 12 13 14 15 1 2 3 4 5 6 7 8 10 ...
Страница 310: ...ELECTRICAL COMPONENTS 7 53 14 2 15 1 3 4 5 6 7 8 10 11 13 12 9 ...
Страница 336: ...TROUBLESHOOTING 8 5 ...
Страница 338: ......
Страница 339: ......
Страница 340: ......