Perio
d
ic maintenance an
d
a
d
justment
7-12
7
4. Remove the cowling by removing
the upper projections from the
slots.
To install the cowling
1. Fit the upper projections into the
slots.
2. Slide the cowling as shown.
3. Install the bolts, quick fastener,
and quick fastener screw.
TIP
Install the bolts loosely, then install the
quick fastener and quick fastener
screw, and then tighten the bolts.
4. Install the panel.
Cowlin
g
D
To remove the cowling
1. Remove panel B and cowling C.
2. Remove cowling D by removing
the bolts.
1. Cowling C
1. Cowling C
1
1
1. Cowling C
1. Cowling C
1
1
1. Cowling D
2. Bolt
2
1
2
UBN6E2E0.book Page 12 Friday, December 7, 2018 2:56 PM