8-56
8
To install the battery
1. Place the battery in its compartment.
2. Connect the positive battery lead first, then
connect the negative battery lead by installing
their bolt.
NOTICE:
When installing the bat-
tery, the main switch must be off, and the
positive lead must be connected before
the negative lead.
[ECB01111]
3. Install the battery holding plate by installing
the nuts.
4. Install the front carrier by installing the bolts
and tightening them to the specified torques.
5. Install the panel.
TIP
Make sure the positive and negative battery
leads are installed as shown.
Fully charge the battery before installing it.
1. Positive battery lead (red)
2. Negative battery lead (black)
1
2
Tightening torques:
Carrier bolt (upper):
34 N·m (3.4 kgf·m, 25 lb·ft)
Carrier bolt (lower):
34 N·m (3.4 kgf·m, 25 lb·ft)
Carrier bolt (under the fenders):
7 N·m (0.7 kgf·m, 5.2 lb·ft)
UB1A60E0.book Page 56 Wednesday, March 1, 2017 2:36 PM
Содержание GRIZZLY YFM70GPXJ 2017
Страница 2: ...DIC183 Original instructions Notice originale Manual original PRINTED IN USA 2017 03 0 7 1 CR E F S ...
Страница 12: ...1 2 1 For Europe 2 1 3 4 5 7 6 6 8 6 6 12 11 9 10 UB1A60E0 book Page 2 Wednesday March 1 2017 2 36 PM ...
Страница 15: ...1 5 1 1P0 F816R 00 YAMAHA YAMAHA 1HP F811R 00 10 9 UB1A60E0 book Page 5 Wednesday March 1 2017 2 36 PM ...
Страница 20: ...1 10 1 For Oceania 1 2 3 4 6 11 10 12 7 8 9 5 5 UB1A60E0 book Page 10 Wednesday March 1 2017 2 36 PM ...
Страница 73: ...7 1 7 EBU21142 RIDING YOUR ATV UB1A60E0 book Page 1 Wednesday March 1 2017 2 36 PM ...
Страница 164: ...9 3 9 8 Remove the battery and fully charge it See page 8 53 UB1A60E0 book Page 3 Wednesday March 1 2017 2 36 PM ...
Страница 172: ...11 2 11 1 Model label 1 UB1A60E0 book Page 2 Wednesday March 1 2017 2 36 PM ...
Страница 175: ...UB1A60E0 book Page 3 Wednesday March 1 2017 2 36 PM ...