
8-59
8
2. Connect the positive battery lead first, then
connect the negative battery lead by installing
their bolt.
NOTICE:
When installing the bat-
tery, the main switch must be off, and the
positive lead must be connected before
the negative lead.
[ECB01110]
3. Install the battery holding plate by installing
the nuts.
4. Install the front carrier by installing the bolts
and tightening them to the specified torques.
5. Install the panel.
EBU30520
Replacing a fuse
1. Positive battery lead (red)
2. Negative battery lead (black)
1
2
Tightening torques:
Carrier bolt (top):
34 Nm (3.4 m·kgf, 25 ft·lbf)
Carrier bolt (under the fenders):
7 Nm (0.7 m·kgf, 5.1 ft·lbf)
1. Fuse box
2. Main fuse
3. EPS fuse (for EPS model)
4. Fuel injection system spare fuse
5. Fuel injection system fuse
U1HP61E0.book Page 59 Thursday, April 5, 2012 3:33 PM
Содержание GRIZZLY 700 2012
Страница 2: ...PRINTED IN USA 2012 04 0 6 1 CR E F S DIC183...
Страница 14: ...1 4 1 37S F816S 00 1P0 F816R 00 YAMAHA 10 11 12 U1HP61E0 book Page 4 Thursday April 5 2012 3 33 PM...
Страница 18: ...1 8 1 For Oceania 1 2 3 4 6 7 9 8 10 5 5 U1HP61E0 book Page 8 Thursday April 5 2012 3 33 PM...
Страница 69: ...7 1 7 EBU21141 RIDING YOUR ATV U1HP61E0 book Page 1 Thursday April 5 2012 3 33 PM...
Страница 170: ...11 2 11 1 Model label U1HP61E0 book Page 2 Thursday April 5 2012 3 33 PM...
Страница 173: ...U1HP61E0 book Page 3 Thursday April 5 2012 3 33 PM...