2-12
INSP
ADJ
• Install the new valve pad
1
and the valve lifter
2
.
NOTE:
• Apply molybdenum disulfide oil to the valve pad
and the valve lifter.
• The valve lifter must turn smoothly when rotated
by hand.
• Install the valve lifter and the valve pad in the cor-
rect place.
• Install the exhaust and intake camshafts, timing
chain and camshaft caps.
NOTE:
• Refer to “CAMSHAFTS” in CHAPTER 5.
• Lubricate the camshaft caps, camshaft lobes,
camshaft journals and camshaft cap bolts.
• Align the camshaft marks with the camshaft cap
marks.
• Rotate the crankshaft clockwise several turns to
seat the parts.
• Measure the valve clearance again.
• If the valve clearance is still out of specification,
repeat all of the valve clearance adjustment
steps until the specified clearance is obtained.
7. Install:
• All removed parts
NOTE:
For installation, reverse the removal procedure.
8. Add:
• Engine oil
Refer to “ENGINE OIL REPLACEMENT”.
T
R
.
.
Camshaft cap bolt:
10 Nm (1.0 m · kg, 7.2 ft · lb)
1
2
THROTTLE BODY SYNCHRONIZATION
NOTE:
Prior to synchronizing the throttle bodies, the valve
clearance should be properly adjusted.
1. Remove:
• Fuel tank
Refer to “SEAT AND FUEL TANK” in CHAP-
TER 5.
Содержание FX10X 2008
Страница 2: ......
Страница 312: ...7 36 FI ...
Страница 333: ...8 21 ELEC CHARGING SYSTEM ...
Страница 341: ...8 29 ELEC LIGHTING SYSTEM ...
Страница 400: ...9 39 SPEC CABLE ROUTING G H I J K L L M A 0 0 0 B C D E H 9 F 1 1 2 3 4 5 6 9 O P L 2 6 1 M L 1 6 2 N M A A A A 8 7 ...
Страница 402: ...9 41 SPEC CABLE ROUTING G H I J K L L M A 0 0 0 B C D E H 9 F 1 1 2 3 4 5 6 9 O P L 2 6 1 M L 1 6 2 N M A A A A 8 7 ...
Страница 404: ...9 43 SPEC CABLE ROUTING 9 1 2 3 4 5 6 6 7 7 8 ...
Страница 406: ......
Страница 407: ......