POWR
Power unit
5-45
6D93G11
2.
Install the upper bearing into the con-
necting rod
1
and the lower bearing into
the connecting rod cap
2
.
NOTE:
Install the bearings in their original positions.
3.
Put a piece of Plastigauge (PG-1) onto
the crankpin, parallel to the crankshaft.
NOTE:
Be sure not to put the Plastigauge (PG-1)
over the oil hole in the crankpin of the crank-
shaft.
4.
Install the connecting rod to the crankpin
3
.
NOTE:
Make sure that the large, flat side
a
on the
connecting rod faces towards the flywheel
magnet side of the crankshaft.
5.
Tighten the connecting rod bolts to the
specified torques in two stages.
NOTE:
• Reuse the removed connecting rod bolts.
• Do not turn the connecting rod until the
crankpin oil clearance measurement has
been completed.
S60C5960
1
2
T
R
.
.
Connecting rod bolt:
1st: 18 N·m (1.8 kgf·m, 13.3 ft·lb)
2nd: 80°
S60C5A10
a
Содержание F80BETL
Страница 1: ...F80B F100D SERVICE MANUAL 6D9 28197 3G 11 ...
Страница 4: ......
Страница 46: ...CHK ADJ Periodic checks and adjustments 3 17 6D93G11 MEMO ...
Страница 137: ...6D93G11 6 14 1 2 3 4 5 6 7 8 9 Bearing inner race attachment 0 90890 06661 Propeller shaft housing ...
Страница 148: ...LOWR Lower unit 6 25 6D93G11 Shimming 6 ...
Страница 153: ...6D93G11 6 30 1 2 3 4 5 6 7 8 9 MEMO Backlash ...
Страница 215: ...6D93G11 8 12 1 2 3 4 5 6 7 8 9 S60V8265 Br B Fuel control system Starting system ...
Страница 244: ...Index i 4 6D93G11 U Upper case 7 6 V Vapor separator 4 10 Ventilation 1 3 Y Yamaha Diagnostic System 9 2 ...
Страница 245: ...6D93G11 i 5 1 2 3 4 5 6 7 8 9 Index MEMO ...
Страница 247: ......
Страница 248: ...YAMAHA MOTOR CO LTD Printed in the Netherlands Nov 2004 1 2 1 CR E ...