E
EMU00174
Chapter 3
OPERATION
INSTALLATION
........................................3-1
Mounting the outboard motor............3-2
BREAKING IN (RUNNING IN) ENGINE
...3-4
PRE-OPERATION CHECKS
......................3-5
Checking the engine oil level ..............3-6
Filling fuel..............................................3-7
STARTING ENGINE
.................................3-8
WARMING UP ENGINE
.........................3-11
SHIFTING
................................................3-12
STOPPING ENGINE
...............................3-13
TRIMMING OUTBOARD MOTOR
.........3-14
TILTING UP/DOWN
...............................3-17
CRUISING IN OTHER CONDITIONS
.....3-19
Cruising in salt water .........................3-19
1
2
3
4
5
6
68V-9-14-3 2/20/03 13:32 Page 1
Содержание F115C
Страница 2: ...68V 9 14 Hyoshi 2 20 03 13 16 Page 2 www reelschematic com ...
Страница 94: ...E MEMO 68V 9 14 4 3 11 03 19 35 Page 32 www reelschematic com ...
Страница 105: ...E EMU00450 Chapter 6 INDEX INDEX 6 1 1 2 3 4 5 6 68V 9 14 6 2 20 03 14 10 Page 1 www reelschematic com ...
Страница 116: ...PLACE POSTAGE HERE ATTN WARRANTY DEPARTMENT Warranty card 2 27 02 11 47 AM Page 2 www reelschematic com ...