PERIODIC MAINTENANCE AND MINOR REPAIR
6-6
6
EAU03596
Cowling B
To remove the cowling
1. Remove cowling A. (See page 6-5
for cowling removal and installa-
tion procedures.)
2. Remove the grab bar by removing
the bolts.
3. Remove the screws, and then pull
the cowling off as shown.
To install the cowling
1. Place the cowling in the original
position, and then install the
screws.
2. Install the grab bar by installing the
bolts.
3. Install cowling A.
1. Grab bar
2. Cowling B
1. Bolt (
×
2)
1. Screw (
×
2)
E_4km.book Page 6 Thursday, September 7, 2000 9:32 AM
Содержание Diversion 900
Страница 1: ...4KM 28199 E6 OWNER S MANUAL XJ900S ...
Страница 2: ...F_5eb_Toc0 fm Page 2 Wednesday February 2 2000 2 02 PM ...
Страница 8: ...E_4km book Page 2 Thursday September 7 2000 9 32 AM ...
Страница 33: ...PRE OPERATION CHECKS 4 Pre operation check list 4 1 E_4km book Page 1 Thursday September 7 2000 9 32 AM ...
Страница 36: ...E_4km book Page 3 Thursday September 7 2000 9 32 AM ...
Страница 80: ...E_4km book Page 37 Thursday September 7 2000 9 32 AM ...
Страница 81: ...MOTORCYCLE CARE AND STORAGE 7 Care 7 1 Storage 7 4 E_4km book Page 1 Thursday September 7 2000 9 32 AM ...
Страница 87: ...SPECIFICATIONS 8 Specifications 8 1 Conversion table 8 5 E_4km book Page 1 Thursday September 7 2000 9 32 AM ...
Страница 98: ...F_5eb_Toc0 fm Page 2 Wednesday February 2 2000 2 02 PM ...
Страница 99: ...F_5eb_Toc0 fm Page 2 Wednesday February 2 2000 2 02 PM ...
Страница 100: ...PRINTED ON RECYCLED PAPER YAMAHA MOTOR CO LTD PRINTED IN JAPAN 2000 7 0 6 1 CR E ...