CLP-150/CLP-150M/CLP-150C
8
(Fig. 6)
(Fig. 8)
(Fig. 7)
6.
MA120 Circuit Board
(Time required : About 15 minutes)
6-1
Remove the top board assembly. (See procedure 2)
6-2
Remove the MA120 assembly. (See procedure 4)
6-3
Remove the five (5) screws marked [1A], the four (4)
screws marked [2] and the screw marked [3A]. The
MA120 circuit board can then be removed. (Fig. 6)
8.
FU120L Circuit Board
(Time required : About 15 minutes)
8-1
Remove the top board assembly. (See procedure 2)
8-2
Disconnect the AC cord.
8-3
Remove the FU120LB assembly. (See procedure 4)
8-4
Remove the four (4) screws marked [1B]. The FU120L
circuit board can then be removed. (Fig. 8)
8-5
Remove the two (2) screws marked [4C]. (Fig. 8)
(General export model only)
[1B]
[1B]
[4C]
FU120L
[1B]: Bind Head Tapping Screw-B 3.0x8 MFZN2BL (EP600190)
[4C]: Bind Head Screw 3.0x10 MFZN2BL (EG330380)
MA120
[1A]
[1A]
[1A]
[2]
[3A]
[2]
[2]
[2]
[1A]: Bind Head Tapping Screw-B 4.0x8 MFZN2Y (EP640410)
[2]:
Bind Head Tapping Screw-B 3.0x10 MFZN2Y (EP600220)
[3A]: Bind Head Tapping Screw-B 3.0x16 MFZN2Y (EP600390)
[4]:
Bind Head Tapping Screw-B 3.0x8 MFZN2BL (EP600190)
[6]:
Hexagonal Nut 12.0 14x2 MFZN2BL (VB508600)
AJK
DJK
[4B]
[4B]
[4A]
[4A]
[4A]
[6A]
[4B]
[6B]
7.
DJK Circuit Board, AJK Circuit Board
(Time required : About 15 minutes)
7-1
Remove the top board assembly. (See procedure 2)
7-2
Remove the jack assembly. (See procedure 4)
7-3
Remove the six (6) screws marked [4A] and the
hexagonal nut marked [6A]. The DJK circuit board can
then be removed. (Fig. 7)
7-4
Remove the five (5) screws marked [4B] and the four
(4) hexagonal nuts marked [6B]. The AJK circuit board
can then be removed. (Fig. 7)