PERIODIC MAINTENANCE AND ADJUSTMENT
7-8
7
To install the cowling
1. Align the projections on cowling A
with the slots of cowling B, and
then push cowling A into the orig-
inal position.
2. Install cowling A and B by install-
ing the screws and bolts.
TIP
_
When installing cowling A, push in on
the areas shown from bottom to top.
_
3. Install panel A.
EAUU0781
Panel A
To remove the panel
1. Remove the screws from panel A.
2. Pull panel A off as shown.
TIP
_
When removing the panel, pull out on
the areas shown. If the panel is re-
moved in the wrong direction, it may be
broken.
_
To install the panel
1. Align the projections on panel A
with the slots of cowling A and B,
and then push panel A into the
original position.
2. Install panel A by installing the
screws.
EAU19482
Panel B
To remove the panel
1. Open the seat. (See page 4-9.)
2. Remove the screws, and then pull
the panel off as shown.
ZAUU0612
1. Panel A
2. Screw (
×
2)
1
2
ZAUU0930
ZAUU0931
1PNF8199E0.book Page 8 Friday, August 24, 2012 2:00 PM