AES620HB
2
E01 E03
E06 E07
E02 E03
E04 E05
E04 E05
E08
E15
E16
E21
D01
G10
E14
E13
E11
E12
E10
E09
E20
F01
Fbe
F03
F02
E17
E18
E16
E17 E18
E16
E17
E18
G01
G03
G02
G05
G04
G08
G09
G07
E19
FRONT VOLUME: 15A 500K
Ω
Fba
E22 E23
F07 F08 F09
G06
The nut in service parts is formed with some
string grooves. However, you need to make
fine adjustments of the grooves to fit on the
string to be used when replacing the nut.
F04 F05 F06
E19
REAR VOLUME: 15A 500K
Ω
Fba
F04 F05 F06
E19
MASTER TONE: 05A 250K
Ω
Fbd
Fbb
F04 F05 F06
E11
E10
E19a
E19a
E19a
Bridge Assembly: Ping Well TP6-05Y (QC656000)
OVERALL ASSEMBLY
E09
Jack Installation
F07
E09b
E09c
E09d
E09a
E09f
E09e
F07
F09
F08