FRONT CONSTANT VELOCITY SHAFT ASSEMBLIES, DIFFEREN-
TIAL ASSEMBLY AND FRONT DRIVE SHAFT
8-9
EBS30240
DISASSEMBLING THE FRONT CONSTANT
VELOCITY SHAFT ASSEMBLIES
The following procedure applies to both of the
front constant velocity shaft assemblies.
1. Remove:
• Boot bands
• Clip “1”
• Double offset joint “2”
• Circlip “3”
• Ball bearing “4”
• Dust boot “5”
TIP
Before removing the clip, slide the dust boot
away from the double offset joint.
2. Remove:
• Boot band “1”
Use the boot band installation tool “2”.
3. Remove:
• Dust boot
• Constant velocity joint
• Clip
TIP
Secure the constant velocity shaft in a vise, and
then remove the constant velocity joint using
hammers.
EBS30241
CHECKING THE FRONT CONSTANT
VELOCITY SHAFT ASSEMBLIES
The following procedure applies to both of the
front constant velocity shaft assemblies.
1. Check:
• Double offset joint splines
• Constant velocity joint splines
• Constant velocity shaft splines
Wear/damage
→
Replace.
2. Check:
• Dust boots
Cracks/damage
→
Replace.
NOTICE
ECB01590
Always use a new boot band.
3. Check:
• Balls and ball races
• Inner surface of double offset joint
Pitting/wear/damage
→
Replace.
A. Differential side
Boots band installation tool
90890-01526
Boots band installation tool
YM-01526
5
1
2
A
4
3
A
B. Wheel side
B. Wheel side
1
2
B
B
Содержание 2016 Grizzly yfm700gplg
Страница 6: ......
Страница 8: ......
Страница 11: ...IDENTIFICATION 1 2 ...
Страница 37: ...ENGINE SPECIFICATIONS 2 6 Air induction system Solenoid resistance 18 22 Ω ...
Страница 58: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27 EBS30023 LUBRICATION DIAGRAMS 6 7 8 9 3 4 3 2 1 5 ...
Страница 60: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29 1 2 3 4 5 ...
Страница 62: ...COOLING SYSTEM DIAGRAMS 2 31 EBS20021 COOLING SYSTEM DIAGRAMS 1 2 3 10 9 8 6 7 5 4 ...
Страница 72: ...CABLE ROUTING 2 41 Engine right side view 2 C E 1 9 10 E 1 9 10 E 5 6 9 A B C D 1 2 3 4 5 6 7 8 ...
Страница 76: ...CABLE ROUTING 2 45 Engine top view B 5 6 7 8 9 10 11 12 13 14 15 16 17 A 1 2 3 4 19 20 21 22 C 18 11 17 17 ...
Страница 78: ...CABLE ROUTING 2 47 Front and rear brake hoses F 3 F 3 F 3 3 I G H 4 4 B C D 2 E D 2 A 1 ...
Страница 80: ...CABLE ROUTING 2 49 ...
Страница 83: ......
Страница 119: ...PERIODIC MAINTENANCE 3 36 A Headlight left and right B Handle mounted light b a 1 A b a 1 B ...
Страница 120: ...PERIODIC MAINTENANCE 3 37 ...
Страница 183: ...STEERING STEM 4 60 TIP Align the punch mark a on the EPS unit with the groove b in the pitman arm 1 b a ...
Страница 197: ...REAR ARMS AND REAR SHOCK ABSORBER ASSEMBLIES 4 74 7 9 8 9 7 3 5 4 5 3 6 2 10 10 1 ...
Страница 198: ...REAR ARMS AND REAR SHOCK ABSORBER ASSEMBLIES 4 75 ...
Страница 203: ...ENGINE INSPECTION 5 2 Top cover Refer to GENERAL CHASSIS 2 on page 4 6 ...
Страница 244: ...ELECTRIC STARTER 5 43 a b b 1 2 3 ...
Страница 316: ...AIR INDUCTION SYSTEM 7 9 EBS20057 AIR INDUCTION SYSTEM 3 4 1 2 3 4 1 2 ...
Страница 352: ...REAR CONSTANT VELOCITY SHAFT ASSEMBLIES FINAL DRIVE ASSEMBLY AND REAR DRIVE SHAFT 8 31 ...
Страница 355: ......
Страница 365: ...ELECTRIC STARTING SYSTEM 9 10 ...
Страница 369: ...CHARGING SYSTEM 9 14 ...
Страница 417: ...FUEL PUMP SYSTEM 9 62 ...
Страница 432: ...ELECTRICAL COMPONENTS 9 77 EBS20084 ELECTRICAL COMPONENTS 4 5 6 7 8 9 10 11 12 13 14 15 16 17 19 18 1 2 3 ...
Страница 434: ...ELECTRICAL COMPONENTS 9 79 1 2 3 5 7 8 9 10 11 12 13 14 15 16 17 18 19 4 6 ...
Страница 454: ...ELECTRICAL COMPONENTS 9 99 ...
Страница 461: ...TROUBLESHOOTING 10 6 Too many electrical accessories Incorrect connection Faulty tail brake light assembly ...
Страница 468: ......
Страница 469: ......
Страница 470: ......