PERIODIC MAINTENANCE AND ADJUSTMENT
7-15
1
2
3
4
5
6
7
8
9
6. Remove the coolant reservoir cap.
7. Drain the coolant from the coolant
reservoir by turning it upside down.
8. Install the coolant reservoir by
placing it in the original position,
and then installing the bolts.
9. Remove the coolant drain bolt to
drain the cooling system.
10. After the coolant is completely
drained, thoroughly flush the cool-
ing system with clean tap water.
11. Install the coolant drain bolt, and
then tighten it to the specified
torque.
TIP
Check the washer for damage and re-
place it if necessary.
12. Pour the specified amount of the
recommended coolant into the ra-
diator and reservoir.
13. Install the coolant reservoir cap.
14. Install the radiator cap.
15. Start the engine, let it idle for sev-
eral minutes, and then turn it off.
16. Remove the radiator cap to check
the coolant level in the radiator. If
necessary, add sufficient coolant
until it reaches the top of the radia-
tor, and then install the radiator
cap and its retaining bolt.
17. Check the coolant level in the res-
ervoir. If necessary, remove the
coolant reservoir cap, add coolant
to the maximum level mark, and
1. Bolt
1. Coolant reservoir cap
1
1
1. Coolant drain bolt
Tightening torque:
Coolant drain bolt:
10 Nm (1.0 m·kgf, 7.2 ft·lbf)
1
Antifreeze/water mixture ratio:
1:1
Recommended antifreeze:
High-quality ethylene glycol anti-
freeze containing corrosion inhibitors
for aluminum engines
Coolant quantity:
Radiator capacity (including all
routes):
0.90 L (0.95 US qt, 0.79 Imp.qt)
Coolant reservoir capacity (up to the
maximum level mark):
0.25 L (0.26 US qt, 0.22 Imp.qt)
Содержание 2009 WR250R
Страница 1: ...OWNER S MANUAL 32D 28199 22 WR250RY Read this manual carefully before operating this vehicle ...
Страница 10: ...LOCATION OF IMPORTANT LABELS 1 3 1 2 3 4 5 6 7 8 9 1 ...
Страница 11: ...LOCATION OF IMPORTANT LABELS 1 4 1 2 3 4 5 6 7 8 9 1 ...
Страница 99: ......
Страница 100: ...PRINTED ON RECYCLED PAPER YAMAHA MOTOR CO LTD PRINTED IN JAPAN 2008 10 0 2 1 E ...