BELT DRIVE
ENG
%m
V-BELT AND PRIMARY/SECONDARY SHEAVE
40Nm (4.0 m
«
kg, 28.9 f
H
b)
30Nm (3.0 m
«
kg, 21.7 f
H
b)
Order
Job/Part
Q’ty
Remarks
1
2
3
4
5
6
7
8
9
10
11
12
13
Removing the V-belt and primary/sec-
ondary sheave
Primary sheave nut/Plate washer
Oneway clutch
Primary fixed sheave
Secondary sheave nut
Clutch housing
Secondary sheave
V-belt
Plate washer
Collar
Primary sliding sheave
Cam/Weight
Slider
Plate washer
1/1
1
1
1
1
1
1
1
1
1
1/6
3
1
Remove the parts in the order listed.
Refer to”REMOVING THE PRIMARY
SHEAVE” and “INSTALLING THE SEC-
ONDARY SHEAVE, V-BELT AND PRI-
MARY SHEAVE” .
Refer to”REMOVING THE SECOND-
ARY SHEAVE AND V-BELT” and “IN-
STALLING THE SECONDARY
SHEAVE, V-BELT AND PRIMARY
SHEAVE” .
For installation, reverse the removal pro-
cedure.
5-42
Downloaded
from
www.ScooterTime.net