E
HOW TO USE THIS MANUAL
1
The main points regarding removing/installing and disassembling/assembling procedures
are shown in the exploded views.
2
The numbers in the exploded views indicate the required sequence of the procedure and
should be observed accordingly.
3
Symbols are used in the exploded views to indicate important aspects of the procedure.
A list of meanings for these symbols is provided on the following page.
4
It is important to refer to the job instruction charts at the same time as the exploded views.
These charts list the sequence that the procedures should be carried out in, as well as pro-
viding explanations on part names, quantities, dimensions and important points relating
to each relevant task.
Example:
O-ring size
39.5
×
2.5 mm: inside diameter (D)
×
ring diameter (d)
5
In addition to tightening torques, the dimensions of the bolts and screws are also men-
tioned.
Example:
Bolt and screw size
: bolt and screw diameter (D)
×
length (L)
6
In addition to the exploded views and job instruction charts, this manual provides individ-
ual illustrations when further explanations are required to explain the relevant procedure.
d
D
10
×
25 mm
D
L
Содержание 150A
Страница 1: ...64C 28197 Z8 11 SERVICE MANUAL 150A 150F L150F D150H 175D 200F L200F 200G 225D ...
Страница 8: ......
Страница 40: ......
Страница 46: ...Thank you very much for your reading Please Click Here Then Get More Information ...