Yale Shaw-Box YK Скачать руководство пользователя страница 13

11

12

SINGLE & DOUBLE GIRDER TOP-RUNNING BRIDGES

WITH INDIVIDUAL MOTOR DRIVEN

END TRUCKS

P/N: 11532620   REV. AA

   September 2018

MAINTENANCE CONTINUED

9.  Put the rubber bearing holder in touch with the brake cover.

10.  Put the ball bearing in touch with the rubber bearing holder and 

lock with the retaining ring.

11. Put the fan and screw the (2) screws of the clamp.

12. Put the fan cover and tighten with (4) M4 screws.

 Fir Gearmotor

Motor 

horsepower

KW

Normal 

Air Gap

Maximum 

Air Gap

Brake Mounting

Bolt Torque

 0.75

0.55

0.3

0.4

Not Defined

 1.0

0.75

0.4

0.5

Not Defined

 1.5

1.2

0.4

0.5

Not Defined

 2.0

1.5

0.4

0.5

Not Defined

 3.0

2.2

0.4

0.5

Not Defined

 5.0

3.6

 -

 -

 -

BRAKE RECTIFIER REMOVAL AND REPLACEMENT

Rectifier is located inside the motor conduit box cover. To replace 

follow these steps:

1.  Disconnect and lock out power supply.

2.  Unplug motor leads and open conduit box.

3.  Remove rectifier and unplug wires.

4.  Plug wires into replacement rectifier.  

      a.  Connect brake leads to DC side of rectifier, terminals  
        marked 

“+” & “–”.

      

b.  Connect leads from the plug to the AC side, two terminals  

            marked “~”.

5.  Re-assemble in reverse order disassembly.

6.  Turn power onto crane and test for proper operation.

BRAKE REMOVAL AND REPLACEMENT

If brake air gap exceeds the maximum allowed, or is not functioning 

properly, the brake may need to be replaced. Follow these 

instructions.

1.  Turn power off to crane and lock out

2.  Unplug motor leads, open motor conduit box and disconnect  

     brake leads from rectifier

3.  Remove brake cover

4.  Remove retaining ring and fan (if applicable).

5.  Remove (3) mounting bolts holding brake magnet body in place.  

     Pull brake leads from motor, remove magnet, brake coil and rotor.

6.  Re-assemble in reverse order, and tighten mounting bolts to  

     specified torque.

7.  Turn power back on to crane and test brakes for proper operation.

ELECTRICAL

1. Gearmotors

    a. The bridge gearmotors are inverter duty. If gearmotor requires  

        any service or repairs, other than what is described in this  

        manual, the complete gearmotor must be replaced.

   b. For hoist and trolley motors, consult the hoist and trolley 

literature.

2. Bridge Control Panel.

     a. All connections should be checked frequently for tightness.

3.  Hoist and Trolley. Panel, brakes, limit switches, etc. Consult hoist 

and trolley literature for maintenance and spare parts information.

CMK_12322 Yale Rotating Axle End Truck Parts 11532619-REV AD_mec.indd   12

10/16/18   2:07 PM

Содержание Shaw-Box YK

Страница 1: ...ATION SERVICE PARTS MANUAL SINGLE GIRDER RATED LOADS 115 mm 4 5 thru 305 mm 12 01 DOUBLE GIRDER RATED LOADS 160 mm 6 3 thru 305 mm 12 01 P N 11532620 REV AA September 2018 YALE YK SHAWBOX SK ONLY CMK_...

Страница 2: ...de servicio situados estrat gicamente en Estados Unidos y Canad Estas instalaciones se han seleccionado en base a su capacidad demostrada en la reparaci n de equipos y suminstro de piezas de repuesto...

Страница 3: ...ortant information to help you install operate maintain and service your new top running single or double girder bridge crane We recommend that you study its contents thoroughly before putting the bri...

Страница 4: ...e it matches the power requirements of the crane These types of cranes are usually lifted into position on the runway in one piece Total weight of this crane should be checked against lifting equipmen...

Страница 5: ...For a single girder crane inspect the clearance between the trolley wheels and toe of flange on bridge girder beam per manufacturers requirements For a double girder crane inspect the clearance betwee...

Страница 6: ...ctor will shut off power to all motions WARNING If any push button binds or sticks in any position Do not turn the power on Determine the cause of the malfunction and correct it before operating the c...

Страница 7: ...ting in their thermal protection to disable bridge motion until cooled WARNING THIS EQUIPMENT IS NOT DESIGNED OR SUITABLE AS A POWER SOURCE FOR LIFTING LOWERING OR TRANSPORT OF PERSONS OPERATING THE C...

Страница 8: ...BRIDGES WITH INDIVIDUAL MOTOR DRIVEN END TRUCKS P N 11532620 REV AA September 2018 Figure 2 Operator Hand Signals OPERATING PRECAUTIONS CONTINUED CMK_12322 Yale Rotating Axle End Truck Parts 11532619...

Страница 9: ...E OPERATIONAL INSPECTION elsewhere in this manual PRE SHIFT INSPECTION A pre shift inspection shall be performed by the crane operator or designated person at the beginning of each shift or the first...

Страница 10: ...e and Maintenance Report found elsewhere in this manual Items to be inspected include but are not limited to 1 All functional operating mechanisms for misadjustment interfering with crane operation 2...

Страница 11: ...NE NEAR THE BRIDGE GIRDER S OR SIMULTANEOUSLY AT EACH END OF THE TRUCK BETWEEN THE WHEEL AND THE GIRDER S JACKING OR LIFTING ONLY ONE END OF THE TRUCK MAY PERMANENTLY DAMAGE THE CRANE 3 Remove load fr...

Страница 12: ...by turning the setting bolts hollow screws clockwise out of the brake coil housing 5 Tighten the fixing screws to the appropriate torque 6 Re check and measure the air gap in multiple locations to ch...

Страница 13: ...rse order disassembly 6 Turn power onto crane and test for proper operation BRAKE REMOVAL AND REPLACEMENT If brake air gap exceeds the maximum allowed or is not functioning properly the brake may need...

Страница 14: ...does not constitute a safety hazard before allowing unit to operate When corrective action is completed describe and note date in this column DATE Motor Gears Bearings Wheels Trucks Girders Connection...

Страница 15: ...epower voltage phase and frequency when ordering replacement parts For motors gear cases and electrical components give complete nameplate data WARNING Using commercial or other manufacturer s parts t...

Страница 16: ...489001 2 2 Rail Sweep 88 mm tread 23488806 2 2 23488902 2 2 23489002 2 2 45492701 2 2 10 M10 1 50 SHCS 11802729 4 4 11802729 4 4 11802729 4 4 11802729 8 8 11802729 8 8 11 M10 Flat Washer 11803101 4 4...

Страница 17: ...Complete Brake Kit 180VDC 190 200 230V 380 460V 1 45152055 45152059 45152061 45152063 Complete Brake Kit 250VDC 575V 1 45152056 45152060 45152062 45152064 4 Fan Kit where applicable 1 45152075 4515207...

Страница 18: ...k 0 55 kW hp 160 mm Truck 0 75 kW 1 hp 200 mm Truck 1 2 kW 1 hp 260 mm Truck 1 55 kW 2 hp 260 mm Truck 2 2 kW 3 hp 305 mm Truck 3 7 kW 5 hp Part Number Part Number Part Number Part Number Part Number...

Страница 19: ...Fuses 600V 11695210 10 AMP 11695212 12 AMP 11695220 20 AMP 11695225 25 AMP 11695230 30 AMP 11695235 35 AMP 11695250 50 AMP 11695260 60 AMP 11695270 70 AMP 11695280 80 AMP 11695290 90 AMP 2 1 Main Fus...

Страница 20: ...riable Frequency Drive 45199723 2 HP 230V 45199724 3 HP 230V 45199725 5 HP 230V 45199726 7 5 HP 230V 45199727 10 HP 230V 45199742 2 HP 460V 45199743 3 HP 460V 45199744 5 HP 460V 45199745 7 5 HP 460V 4...

Страница 21: ...BRIDGES WITH INDIVIDUAL MOTOR DRIVEN END TRUCKS P N 11532620 REV AA September 2018 FIGURE 10 INTERCONNECTION WIRING DIAGRAM MAINTENANCE CONTINUED CMK_12322 Yale Rotating Axle End Truck Parts 11532619...

Страница 22: ...ordering parts always furnish Hoist Serial Number Catalog Number Motor Horsepower Voltage Phase Frequency and Rated Load of Hoist on which the parts are to be used PARTS AND SERVICES ARE AVAILABLE IN...

Страница 23: ...LE DOUBLE GIRDER TOP RUNNING BRIDGES WITH INDIVIDUAL MOTOR DRIVEN END TRUCKS P N 11532620 REV AA September 2018 Notes CMK_12322 Yale Rotating Axle End Truck Parts 11532619 REV AD_mec indd 22 10 16 18...

Страница 24: ...R FROM ANY COURSE OF DEALING OR USE OF TRADE ALL OF WHICH ARE HEREBY EXPRESSLY DISCLAIMED C IN NO EVENT SHALL SELLER BE LIABLE TO BUYER OR ANY THIRD PARTY WITH RESPECT TO ANY GOOD OR REPLACEMENT PART...

Отзывы: