![Yale SHAW-BOX YK Series Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/yale/shaw-box-yk-series/shaw-box-yk-series_assembly-and-instruction-manual_3108514012.webp)
P/N: C11746310 REV. AB
June 2022
12
STEP 5:
GIRDER AND C-CHANNEL WELDING (AS REQUIRED)
ALL WELD IS TO BE AWS CLASS E-70XX OR EQUIVALENT
STEP 6:
CHECK CAMBER AFTER WELDING (AS REQUIRED)
CAMBER
≤
{DEFLECTION OF GIRDER AT DEAD LOAD
+ 1/2 * DEFLECTION OF GIRDER AT LIVE LOAD}
NOTICE
Assembly of beam and truck requires
welding. IT IS EXTREMELY IMPORTANT TO
THE SAFETY OF THIS BRIDGE THAT THIS
WELDING BE DONE BY A COMPETENT
WELL-TRAINED WELDER. It is our strong
recommendation that the welder used in
this construction be qualified as prescribed
by the American Welding Society (AWS)
Structural Welding Code-Steel D1.1-2008
and Specification for Welding Industrial
and Mill Cranes D14.1-2005.
Содержание SHAW-BOX YK Series
Страница 13: ...P N C11746310 REV AB June 2022 13 CHAPTER 3 ASSEMBLING BRIDGE GIRDER TO UNDERHUNG END TRUCKS...
Страница 16: ...P N C11746310 REV AB June 2022 16 3 C UNDERHUNG END TRUCK TYPES...
Страница 18: ...P N C11746310 REV AB June 2022 18 3 E ROLLED CHANNEL END TRUCK...
Страница 22: ...P N C11746310 REV AB June 2022 22 STEP 4 LOCATE ALIGN END TRUCKS UHFC...
Страница 23: ...P N C11746310 REV AB June 2022 23 STEP 4A LOCATE ALIGN END TRUCKS UHRC...
Страница 30: ...P N C11746310 REV AB June 2022 30 STEP 10 ASSEMBLING MOTOR AND GEAR REDUCER WITH END TRUCK...
Страница 31: ...P N C11746310 REV AB June 2022 31 STEP 10A UHRC END TRUCK A4 DRIVE INSTALLATION...
Страница 35: ...P N C11746310 REV AB June 2022 35 STEP 14 MOUNTING CROSS SHAFT BEARING AND COUPLING ON CROSS SHAFT SUPPORT...
Страница 36: ...P N C11746310 REV AB June 2022 36 STEP 15 CHECKING HORIZONTAL ALIGNMENT OF THE CROSS SHAFT...
Страница 37: ...P N C11746310 REV AB June 2022 37 STEP 16 ASSEMBLING COUPLING WITH CROSS SHAFT...
Страница 38: ...P N C11746310 REV AB June 2022 38 CHAPTER 4 END STOP ASSEMBLY...
Страница 40: ...P N C11746310 REV AB June 2022 40 CHAPTER 5 MOUNTING HOIST ON GIRDER...
Страница 42: ...P N C11746310 REV AB June 2022 42 STEP 2 MOUNTING HOIST ON GIRDER...
Страница 43: ...P N C11746310 REV AB June 2022 43 Y80 800 HOIST INSTALLATION STEP 1 PREPARATION FOR MOUNTING HOIST ON GIRDER...
Страница 44: ...P N C11746310 REV AB June 2022 44 STEP 2 MOUNTING HOIST ON GIRDER...
Страница 45: ...P N C11746310 REV AB June 2022 45 CHAPTER 6 FESTOON SYSTEM INSTALLATION...
Страница 46: ...P N C11746310 REV AB June 2022 46 6 A PLAN VIEW...
Страница 48: ...P N C11746310 REV AB June 2022 48 STEP 3 C RAIL MOUNTING...
Страница 49: ...P N C11746310 REV AB June 2022 49 STEP 4 C RAIL JOINT ASSEMBLY...
Страница 50: ...P N C11746310 REV AB June 2022 50 STEP 5 MOUNTING BRIDGE PANEL...
Страница 51: ...P N C11746310 REV AB June 2022 51 STEP 6 END STOP ASSEMBLY...
Страница 52: ...P N C11746310 REV AB June 2022 52 STEP 7 HOIST CABLE ASSEMBLY...
Страница 53: ...P N C11746310 REV AB June 2022 53 STEP 8 CONTROL PENDANT CABLE ASSEMBLY...
Страница 57: ...P N C11746310 REV AB June 2022 57 STEP 10 TOW ARM KIT INSTALLATION Y80 800...
Страница 66: ...P N C11746310 REV AB June 2022 66 CHAPTER 7 RADIO CONTROL HORN INSTALLATION FOR FESTOON SYSTEM...
Страница 70: ...P N C11746310 REV AB June 2022 70 NOTES...