09-13-593-Rev2
2/4
INSTALLATION
LOOSELY ASSEMBLE COMPONENTS ONTO BASE PLATE
Loosely assemble the Eye Bolts, Washers and T-Nuts to the Baseplate ensuring the T-Nuts are
placed under the plate. Ensure there is enough slack between the T-Nuts and the Baseplate
to allow the T-Nut to slide under and along the slat channels of the platform.
1
POSITION BASEPLATE
Determine where on the platform you wish
to install the gas bottle holder.
Place Baseplate onto platform and
manoeuvre Baseplate until left-most T-Nut
drops into closest slat channel cutout.
Slide the Baseplate along the slat channel
until the other T-Nut can be inserted in the
slat above to the right. Position Baseplate
to desired position.
2
x2