09-13-592-Rev2
2/4
INSTALLATION
INSERT SPRING NUTS
- PLATFORM
Insert 4x M8 Spring Nuts
into Platform sides and
slats via the cut outs as
shown. Determine the
best slat spacing for the
High Lift Jack Brackets
based on the length of
Jack you will be carrying.
The Spring Nuts
do not need to be
rotated into place.
1
POSITION SPRING NUTS IN CHANNELS
Slide Spring Nuts along channels so they are positioned as close to the
Platform edge/end of crossbars as possible. The Brackets can be used
as a guide for spacing. Ensure nuts are equally spaced as shown. The
Allen Key can be used to assist nut movement within channel.
2
INSERT SPRING NUTS
- LockNLoad BAR
Insert 4x M8 Spring Nuts into
crossbar channels as shown.
Push Spring Nuts down into crossbar
channels and twist to lock into place.