1034492B-3/12
Install Landing Pads.
Continue with
Control Tower
installation.
• Using the hex wrench install each
Catch Mount
and pad as pictured (Catch Mounts are located diagonally from one another). Fully tighten.
• Using the hex wrench install the M6 fastener, washer,
Bare Mount
, and pad as pictured.
• Use covers whenever Control Towers are not installed.
• store covers in safe place whenever Control Towers are installed.
• Periodically remove landing pad and clean under pad.
• Periodically inspect pad for wear or cracking. Replace if damaged.
ATTACHMENT
HARDWARE CAN
LOOSEN OVER TIME.
CHECK AND TIGHTEN
AS NECESSARY,
BEFORE EACH USE.
RECOMMEND
INSTALLATION
TORqUE: 20
IN-LBS
RECOMMEND
INSTALLATION
TORqUE: 20
IN-LBS
CATCH MOUNT
2010-12 BARE MOUNT
A
A
B
A
B
2010-2012 OUTBACK
B