;;;
;;;
;;;;
;;;;;
;;;;;
;;;;;
;;;;;
;;;;;
1032957D-3/12
Tighten the knobs until the box
cannot slide on the bars.
DO NOT OVERTIGHTEN!
REMEMBER…
NEVER REPOSITION YOUR
YAKIMA Q TOWERS!
SECURE THE BOX TO THE BARS:
LOCK T-BOLTS:
T-bolt is locked when “T” is
parallel to the crossbars.
TIGHTEN THE KNOBS.
✓
CHECK ALL 3 LATCHES
PERFORM SAFETY CHECKS:
✓
CHECK INSTALLATION:
Make sure installation is secure by
tugging at box.
The box should NOT SLIDE on the bars.
Open the box and tighten knobs if
necessary.
TO OPEN THE BOX:
• Insert key
• Push knob
in and turn
key
TO LOCK:
Push up on the lid at each latch.
CAUTION: Overstuffing the box
will prevent a secure closure.
• TURN KNOB CLOCKWISE.
Gently raise lid.
Swing brackets into position under bars.
Attach brackets to T-bolts.
ALL THREE
LATCHES must
produce an
audible
“click”
before the
box lid is
secure.
Caution:
When installing or
removing SKS
cores, handle must
be in unlocked
position. Do not
press handle while
installing or
removing cores.
CLOSE LID COMPLETELY:
• UNLOCK. Handle will pop out.
TO CLOSE YOUR BOX:
Grab the lid strap
and pull down until
you can reach it
with your hands
.
Place the strap
inside the box.