Installation
System 182-XT-4
3 - 24
ba76027e02
12/2014
Premounting the ISO
blind nuts
Fig. 3-16 Mounting the sun shield: Premounting the ISO blind nuts
Mounting the DIQ/S 182-
XT-4-PR on the sun
shield
Fig. 3-17 Mounting DIQ/S 182-XT-4-PR on the protective cover of the SSH/IQ
2
Remove the two countersunk screws (pos. 5 in Fig. 3-16) and
swing open the lid.
3
Insert the cheese-head screws (pos. 6 in Fig. 3-16) with the
plastic washers in the drilled mounting holes and loosely screw
in the ISO blind nuts (pos. 7).
7
6
5
Содержание YSI 182-XT-4
Страница 6: ...Contents System 182 XT 4 0 4 ba76027e02 12 2014...
Страница 10: ...Overview System 182 XT 4 1 4 ba76027e02 12 2014...
Страница 14: ...Safety System 182 XT 4 2 4 ba76027e02 12 2014...
Страница 64: ...Installation System 182 XT 4 3 50 ba76027e02 12 2014...
Страница 82: ...Operation System 182 XT 4 4 18 ba76027e02 12 2014...
Страница 88: ...The SETTINGS menu System 182 XT 4 5 6 ba76027e02 12 2014...
Страница 114: ...Relay outputs System 182 XT 4 6 26 ba76027e02 12 2014...
Страница 116: ...Maintenance and cleaning System 182 XT 4 7 2 ba76027e02 12 2014...
Страница 122: ...What to do if System 182 XT 4 8 6 ba76027e02 12 2014...
Страница 134: ...Technical data System 182 XT 4 9 12 ba76027e02 12 2014...
Страница 135: ...System 182 XT 4 1 ba76027e02 12 2014...
Страница 138: ...Accessories and options System 182 XT 4 11 2 ba76027e02 12 2014...
Страница 142: ...Appendix store separately if required System 182 XT 4 13 2 ba76027e02 12 2014...
Страница 143: ......