Lab 955
Operation
ba77144e02
12/2017
15
4.1.4
Socket field
4.2
Switching on the meter
1.
Switch on the meter with
<On/Off>
.
The meter performs a self-test.
2.
Connect the sensor.
The meter is ready to measure.
4.3
Switching off the meter
1.
Switch off the meter with
<On/Off>
.
The meter is switched off.
1 Conductivity measuring cell
2 Power pack
3 Service interface
1
2
3
0
5
2
0
3
5
C
°
S/cm
m
nLF
TP
Tref25
AR
ARng
When the meter is powered by the batteries, it switches itself
off automatically after an adjustable interval to save the bat-
teries (see section Automatic switch-off function, page 27 ).
Содержание SI Analytics Lab 955
Страница 1: ...OPERATING MANUAL ba77144e02 12 2017 Lab 955 CONDUCTIVITY METER ENTER M CAL Lab 955...
Страница 6: ...Contents Lab 955 6 ba77144e02 12 2017...
Страница 42: ...Index Lab 955 42 ba77144e02 12 2017...
Страница 43: ......