Xylem LOWARA VOGEL Series Скачать руководство пользователя страница 5

Operating instructions 

 

1. General

 

 

1.1 Foreword 

 

This product complies with the safety requirements of EC Machinery Directive 2006/42/EC. 

 

The staff employed on installation, operation, inspection and maintenance must be 
able to prove that they know about the relevant accident prevention regulations and 
that they are suitably qualified for this work. If staff do not have the relevant 
knowledge, they should be provided with suitable instruction.
 

 

The operating safety of the pumps or units (i.e. pump plus motor) supplied is only guaranteed if 
these are used in accordance with the provisions given in the attached Data Sheet and/or Point 4 in 
„Installation and Operation“. 
The operator is responsible for following the instructions and complying with the safety 
requirements given in these Operating Instructions. 
Smooth operation of the pump or pump unit can only be achieved if installation and maintenance 
are carried out carefully in accordance with the rules generally applied in the field of engineering 
and electrical engineering. 
If not all the information can be found in these Operating Instructions, please contact us. 
The manufacturer takes no responsibility for the pump or pump unit if the Operating Instructions 
are not followed. 
These Operating Instructions should be kept in a safe place for future use. 
If this pump or pump unit is handed on to any third party, it is essential that these Operating 
Instructions and the operating conditions and working limits given in the Confirmation of Order 
are also passed on in full. 
These Operating Instructions do not take into account all design details and variants nor all the 
possible chance occurrences and events which might happen during installation, operation and 
maintenance. 
Alterations or changes to the machine are only permitted by agreement with the manufacturer. 
Original spare parts and accessories authorised by the manufacturer should be used for greater 
safety. We bear no responsibility for the consequences of using other parts. 
We retain all copyright in these Operating Instructions; they are intended only for personal use by 
the owner of the pump or the pump unit. The Operating Instructions contain technical instructions 
and drawings which may not, as a whole or in part, be reproduced, distributed or used in any 
unauthorised way for competitive purposes or passed on to others. 
 

1.2 Guarantee 

 

The guarantee is given in accordance with our Conditions of Delivery and/or the confirmation of 
order.

 

Repair work during the guarantee period may only be carried out by us, or subject to our written 
approval. Otherwise the guarantee ceases to apply. 
Longer-term guarantees basically only cover correct handling and use of the specified material. 
The guarantee shall not cover natural wear and tear and all parts subject to wear, such as 
impellers, shaft sealings, shafts, shaft sleeves, bearings, wear rings etc., or damage caused by 
transport or improper handling. 

 

 

Pa 100/3-en                                                                                                                                             

Содержание LOWARA VOGEL Series

Страница 1: ...lation Operation and Maintenance Instruction Translation of the Original Operation Manual en Keep for further use Pay attention to this operating instruction before the delivery installation start up...

Страница 2: ...Xylem Service Austria GmbH Ernst Vogel Stra e 2 A 2000 Stockerau Telefon 43 0 2266 604 Fax 43 0 2266 65311 E Mail info austria xyleminc com Internet www xylemaustria com...

Страница 3: ...tion Bearing sizes and oil quantities Grease lubrication 3 Transport Handling and Storage 3 1 Transport Handling 3 2 Storage 4 Installation Operation 4 1 Assembly and connection of pump 4 2 Installati...

Страница 4: ...p 6 Longer periods of non operation 6 1 Drained pumps 6 2 Filled pumps 7 Faults Causes and Solutions 8 Repairs 9 Spare Parts Spare Pumps 9 1 Spare parts Ordering spare parts 9 2 Stand by pumps 10 Plan...

Страница 5: ...y it is essential that these Operating Instructions and the operating conditions and working limits given in the Confirmation of Order are also passed on in full These Operating Instructions do not ta...

Страница 6: ...tor must confirm this by signing the Plant Manager List see Point 10 These Operating Instructions do not refer to the General Regulations on Accident Prevention or local safety and or operating regula...

Страница 7: ...ressure All parts must be allowed to return to ambient temperature Make sure that no one can start the motor during such work It is essential that the procedure for stopping the system described in th...

Страница 8: ...e is given in the sheets of characteristic curves We can supply leaflets for calculation of NPSH values on request Sealing Flushing Cooling Suitable facilities for the regulation and monitoring of sea...

Страница 9: ...pump under the Notes on construction Instructions on packing a stuffing box and on installing and operating mechanical seals are given in the relevant detail drawings in the Appendix See Appendix Ope...

Страница 10: ...grease and are thus ready for use If the type of grease is changed check that it is compatible with the left over oil 3 Transport Handling Storage 3 1 Transport Handling Check the pump pump unit immed...

Страница 11: ...flanges or plugs see also chapter 6 Longer periods of non operation 4 Installation Operation 4 1 Assembly and connection of pump The pump and motor pump unit must be provided with a shared foundation...

Страница 12: ...between the pump motor and the foundation base fit snugly 4 2 Installation and Alignment of Coupling Make sure that nobody can start the motor during work on the coupling According to Accident Preven...

Страница 13: ...be turned When aligning keep the parallel and angular displacement of the shaft ends to a minimum The alignment can be more precise if a dial gauge is used The permitted displacement for your coupling...

Страница 14: ...reased wear on bearings couplings and shaft seals 4 3 Connecting the pipes to the pump Suction and discharge pipe The pipes must be of a size and design that liquid can flow freely into the pump and t...

Страница 15: ...s and quantities are necessary The position and size of connections to the pump are given in the Appendix Summary of Screwed Connections The relevant detail drawing of the shaft sealing contains a dia...

Страница 16: ...itch on any sealing flushing or cooling devices that are provided See Data Sheet for quantity and pressure Open slide valve in suction intake pipe Set discharge side slide valve to approx 25 of rated...

Страница 17: ...should be max 50 C above ambient temperature and should not exceed 90 C check at least once a week Check oil level at least once a week and top up if necessary Check leakage rate from packings at leas...

Страница 18: ...is dismantled Before starting to disassemble the pump unit make sure that it cannot be switched on again The pump casing must be depressurised and empty All valves in the suction intake and discharge...

Страница 19: ...lations Grease lubrication Bearings on pumps that are lubricated for life require no maintenance If the pump is left non operational for any length of time the grease in the bearings should be changed...

Страница 20: ...nges the pump the design data on the Data Sheet and Points 1 2 1 4 of these Operating Instructions should be particularly taken into account If necessary the written agreement of the manufacturer must...

Страница 21: ...p and or pipes not completely filled with liquid fill vent 8 Pump or suction intake pipe blocked clean 9 Air pocket in pipeline vent improve course of pipe 10 NPSH of system too small increase liquid...

Страница 22: ...packing material use suitable material check shaft or shaft sleeve for damage beforehand 21 Deposits on mechanical seal clean replace mechanical seal if necessary if necessary provide additional rinsi...

Страница 23: ...rings adjust in line with the system pressure intake pressure given on ordering 33 System related vibrations resonance seek assistance 34 Manometer indicator wrong check manometer get rid of blockages...

Страница 24: ...4 5 6 7 90 i no of steps To ensure optimum availability we recommend that suitable quantities of spare parts are held in stock especially if these are made from special materials and in the case of m...

Страница 25: ...ow to confirm that he has received read and understood these Operating Instructions He undertakes to follow the instructions conscientiously If these instructions are not followed the manufacturer s g...

Страница 26: ...tor shall duly enter all maintenance and service work that has been carried out and shall see that the person responsible confirms such work by signing below maintenance work Date Signature Plant oper...

Отзывы: