
en – Original Instructions
SCUBA DRY – Additional Installation, Operation and Maintenance Instructions
19
Figure 2: Surface unit, example of positive suction head installation
1.
Diaphragm tank
2.
Bleed valve
3.
Start and stop device
4.
Control panel
5.
Pressure gauge
6.
Check valve
7.
Fill plug
8.
Electric power supply cord
9.
Discharge pipe
10.
Unit
11.
On-off valve
12.
On-off valve
13.
Suction pipe
14.
Filter