background image

Xylem |’zīləm|

1) The tissue in plants that brings water upward from the roots;

2) a leading global water technology company.

We’re a global team unified in a common purpose: creating advanced technology

solutions to the world’s water challenges. Developing new technologies that will

improve the way water is used, conserved, and re-used in the future is central to

our work. Our products and services move, treat, analyze, monitor and return water

to the environment, in public utility, industrial, residential and commercial building

services settings. Xylem also provides a leading portfolio of smart metering,

network technologies and advanced analytics solutions for water, electric and gas

utilities. In more than 150 countries, we have strong, long-standing relationships

with customers who know us for our powerful combination of leading product

brands and applications expertise with a strong focus on developing

comprehensive, sustainable solutions.

For more information on how Xylem can help you, go to www.xylem.com

Xylem Water Solutions Global

Services AB 556782-9253

361 80 Emmaboda

Sweden

Tel: +46-471-24 70 00

Fax: +46-471-24 74 01

http://tpi.xyleminc.com

Visit our Web site for the latest version of this document

and more information

The original instruction is in English. All non-English

instructions are translations of the original instruction.

©

 2020 Xylem Inc

90018601_1.0_en-US_2020-11_IOM_CCD 401

Содержание CCD 401

Страница 1: ...Installation Operation and Maintenance Manual 90018601_1 0 CCD 401 ...

Страница 2: ......

Страница 3: ... Purchaser to ensure adequate coverage in order for the modem to function properly at all times The modem is delivered with a built in SIM card Xylem has roaming agreements with selected operators depending on geography enabling the modem to transmit data Xylem reserves the right to change these operators This might have an effect on the connectivity of the modem It is the responsibility of the Pu...

Страница 4: ......

Страница 5: ... 5 2 2 Parts 5 3 Installation 6 3 1 Connection and configuration Alarm management 6 3 1 1 Precautions 6 3 1 2 Requirements 6 3 1 3 Cables 6 3 1 4 Antenna 7 3 2 Install the equipment to the unit 7 3 3 Check the mobile connection 8 4 Troubleshooting 10 4 1 Symptoms and remedies 10 5 Technical Reference 11 5 1 Dimensions 11 5 2 Environmental requirements 11 5 3 Material 11 5 4 Electrical data 11 5 5 ...

Страница 6: ...t and the surroundings This includes any modification to the equipment or use of parts not provided by Xylem If there is a question regarding the intended use of the equipment please contact a Xylem representative before proceeding 1 2 Safety terminology and symbols About safety messages It is extremely important that you read understand and follow the safety messages and regulations carefully bef...

Страница 7: ...e regulations of your local electricity supplier For more information about requirements see sections dealing specifically with electrical connections 1 3 1 Power lock out DANGER Electrical Hazard Before starting work on the unit make sure that the unit and the control panel are isolated from the power supply and cannot be energized This applies to the control circuit as well 1 3 2 Qualification o...

Страница 8: ...with other waste at the end of its working life Where marked the chemical symbols Hg Cd or Pb indicate that the battery contains mercury cadmium or lead above the reference levels in Directive 2006 66 EC If batteries are not properly disposed of these substances can cause harm to human health or the environment To protect natural resources and to promote material re use please separate batteries f...

Страница 9: ...Description 1 Antenna 2 Network signal strength 3 Yellow shows connection to the cloud service 4 Green shows power is on 5 Ethernet terminal 6 Digital and analog input 7 RS 232 terminals 8 Input power 9 RS 485 terminals Extra parts Part number Description 851062 2G 3G 4G LTE Antenna wall mount 1 5 m cable SMA m 851063 2G 3G 4G LTE Antenna wall mount 4 m cable SMA m 851064 2G 3G 4G LTE Antenna cabi...

Страница 10: ... carried out or if there is fault or damage on the product Visually inspect equipment for damaged cables cracked casings or other signs of damage Make sure that electrical connections have been correctly made CAUTION Electrical Hazard Prevent cables from becoming sharply bent or damaged 3 1 2 Requirements These requirements apply for the electrical installation The mains voltage and frequency must...

Страница 11: ...he serial number is not seen The unit must not be installed over 2 m 6 56 ft height from the ground 1 Attach the antenna For more information about the antenna see Antenna on page 12 2 Install the unit on a DIN rail 3 Select one of the following steps to connect a device to the unit For more information about the devices that connect with the unit go to the support site at xylem com avensor E01 E0...

Страница 12: ... power supply 7 Configure the connected devices For more information go to the support site at xylem com avensor 3 3 Check the mobile connection The unit is turned on 1 Check the network signal strength LED State Description Solid green Excellent or good signal strength Solid red Medium or fair signal strength Unlit Poor or no signal The state of LED must be solid green to avoid the connectivity p...

Страница 13: ...The unit must not be disconnected during the connection procedure 3 Installation CCD 401 Installation Operation and Maintenance Manual 9 ...

Страница 14: ...ow Make sure that the equipment is not disconnected from the cloud service Repeated disconnections can make the reconnection slow Check the signal strength and install or move the external antenna to improve the signal strength 4 Troubleshooting 10 CCD 401 Installation Operation and Maintenance Manual ...

Страница 15: ...ABS 5 4 Electrical data Feature Description Supply voltage 24 VDC Current Maximum 200 mA at 24 VDC Degree of protection of enclosure IP40 5 5 Radio data The unit has a radio modem that supports the following bands CCD 401 version Network Frequency band CE European version LTE Cat 1 bands 3 7 and 20 GPRS 900 1800 MHz Fallback NA North America version LTE Cat 1 bands 2 4 and 12 5 6 Terminals E01 E02...

Страница 16: ...put 3 Pull up input DI4 Digital input 4 Pull up input DC Input power 24 VDC DC Input power ground earth GND Signal ground 232 TX RS 232 Tx RTU Rx 232 RX RS 232 Rx RTU Tx E21 Not used GND Signal ground Signal ground chassis ground E24 Not used 24 24 VDC supply maximum 50 mA E26 Not used E27 Not used GND Signal ground AI2 Analog input 2 4 20 mA AI1 Analog input 1 4 20 mA Antenna SMA connector Maximu...

Страница 17: ......

Страница 18: ......

Страница 19: ......

Страница 20: ...ng network technologies and advanced analytics solutions for water electric and gas utilities In more than 150 countries we have strong long standing relationships with customers who know us for our powerful combination of leading product brands and applications expertise with a strong focus on developing comprehensive sustainable solutions For more information on how Xylem can help you go to www ...

Отзывы: