5 Operation
5.1 Sequence of operation:
1. When the “Stop” and “Lead” float contact closes, the pump will energize and the pump
run light will illuminate. The pump will remain operational until the “Stop” float opens.
2. If the level continues to rise, the “High” float will trigger the high liquid alarm. This will
illuminate the 360– degree visible beacon and sound an 85 –decibel at 10’ buzzer.
5.2 Remote monitoring dry contacts:
Normally Open dry contacts for high level, pump run, and pump fault.
Note: Refer to wiring schematic for proper termination.
5 Operation
10
3DWS/4DWS Single Phase Simplex Control Panel Instruction Manual
Содержание Bell & Gossett 3DWS
Страница 1: ...Instruction Manual IM403 3DWS 4DWS Single Phase Simplex Control Panel...
Страница 2: ......