Xtreme Power Conversion Corporation
P91c-1000 User’s Manual
Page 5
Uninterruptible Power Supply
Installation and setup
NOTE: Before installation, please inspect the unit. Be sure that nothing inside the package is damaged.
Please keep the original package in a safe place for future use.
Rear panel view
1KL
1
AC input power cord
2
Output receptacle: connect to mission-critical loads.
3
Programmable outlets: connect to non-critical loads
4
USB serial communication port
5
ROO/RPO function connector
6
Intelligent slot