XtraVac VT300 Vacuum Tumbler Operation and Parts Manual
XtraVac Packaging Machines
419 E. 11th Ave. North Kansas City, MO 64116 USA
VT 300 Vacuum Tumbler
+1 (800) 728-2999 [email protected]
12
Chapter 4
:
Instructions of operation, maintenance
4.1. Operation sequence
4.1.1
、
Loading sequence: Make sure to connect the power line and ground line properly.
Confirm that switch is on Manu position
。
Turn on the machine power switch.
(Page8-E), and open the Air tightness cover (Page15-41). Put in the stuff
and close the air tightness cover(Page15-41),
※
Notice: For shortening the tumbling time and promoting the tenderness, the capacity is
about 50% of the tumbler.
4.1.2
、
Running sequence: Setting the massage time
、
resting time and total time. Then turn the
manual/auto switch
(
Page8-L
)
to auto position, and the tumbler starts running.
Rotating speed is controlled by R.P.M adjusted controller (Page8-J)
。
4.1.3
、
Unloading sequence: After rotating of the tub. Turn the semi/auto switch to manual
position, open the air tightness cover (Page15-41), and turn the Loading/Stop
/Unloading switch
(
Page8-L
)
to Unloading position (Page8-M) for the product
unloading.
4.1.4
、
Before next feeding ,please turn the Manual/Auto switch
(
Page8-L
)
to Manu position.
and turn the Loading/Stop /Unloading switch
to Loading position. The tub will be
reverse turning until the cover upward ,please turn the switch to Stop position. Then
Put in the stuff and close the air tightness cover
。
4.2
、
Maintenance
4.2.1
、
The machine should be cleaned thoroughly after each using. As vacuum
tube(Page15-37)
、
filter cup(Page15-29)
、
Air tightness cover (Page15-41)are needed to
cleaned and set near the machine for dry.
4.2.2
、
Cleaning of the filter: Check the water of the filter if it is filled on schedule. If it is over
Содержание VT300
Страница 1: ......