34
A
B
C
D
E
A
B
C
D
E
PAGE
DA
T
E
NA
ME
P
R
O
C
ES
SED
CH
EC
KED
S
T
AN
DA
RD
content
Chapter 1 Electric control system
1-1 Main control box of diagram
1-2
Contol element of diagram of position
1-3 Electric power diagram
1-4 Control circuit diagram
1-5 Emergency stop sw
itch of position
1
-6 Electric part list
Chapter 2 Pneumation system
2-1 Vacuum system
2-2 Gas system
2-3 Air cylinder control system
2-4 Pneumation part list
P02
P03
P04
P05~P12
P13
P14~15
P16
P17
P18
P19
Содержание 860A8
Страница 3: ...2 5 3 Storage condition 5 4 Operation environment V1 02 ...
Страница 5: ...4 ...
Страница 19: ...18 ...
Страница 21: ...20 ...
Страница 23: ...22 ...
Страница 26: ......
Страница 28: ...27 ...
Страница 30: ...29 ...
Страница 32: ...31 ...
Страница 34: ...33 ...
Страница 47: ...46 A B C D E A B C D E PAGE DATE NAME PROCESSED CHECKED STANDARD Vacuum system ...
Страница 48: ...47 C C1 STANDARD CHECKED PROCESSED NAME DATE PAGE E D C B A E D C B A Gas system ...
Страница 49: ...48 Y5 STANDARD CHECKED PROCESSED NAME DATE PAGE E D C B A E D C B A M1 Air cylinder control system ...