background image

 

 

11 

3.2. Hardware Installation 

Please follow the steps shown below for a better understanding on how to install hardware in 
NuStreams-700. 

3.2.1. Bracket installation

 

Steps for installing a Bracket in NuStreams-700 

 

First of all, you must have an Empty 
Slot for the Installation of a Bracket. 

 

Attach the Bracket

’s screw end on the 

internal Chassis

’ screw holes, and lock 

the screw on the screw hole. 

Note: we advise to use brackets to 
close the unused slots of the 
NuStreams-700 for internal protection.   

 

 

Содержание NuStreams-700

Страница 1: ...NuStreams 700 User s Manual USM Ver 1 2...

Страница 2: ...urate and reliable However Xtramus Technologies assumes no responsibility or liability for any errors or inaccuracies that may appear in the document Trademarks NuStreams 700 is a trademark or registe...

Страница 3: ...on History 2016 08 23 1 0 First draft version 2020 02 19 1 1 Add XM RM882 description Remove 2 software description Modify the description about module LED 2021 01 04 1 2 Remove software descriptions...

Страница 4: ...SE T Copper Wire 8 3 1 2 10GBASE R Optical Fiber 9 3 2 Hardware Installation 11 3 2 1 Bracket installation 11 3 2 2 Module Cards Installation 12 4 NuStreams 700 s Module Cards 13 4 1 System Module Car...

Страница 5: ...e based on RFC 2889 and 2285 or NuApps 2544 RM another suite based on RFC 1242 and 2544 to perform tests on NuStreams 700 In addition to the software suites provided by Xtramus users may develop custo...

Страница 6: ...alyze the test results and DUT performance with intuitive GUI interface Module cards that work as management interfaces of NuStreams 700 are available and support different Ethernet transferring rate...

Страница 7: ...7 slots for installation of module cards where each module card provides streams generating platforms for different types of media Besides the Front Part includes 2 slots with System and Power module...

Страница 8: ...ing the chassis attached to the Top Bottom Panel are easily to replace The steps to replace the fans are 1 Unscrew the screws on the Top Bottom Panel 2 Open the Top Bottom Panel 3 Disassemble the old...

Страница 9: ...tors 10GBASE T uses 650 MHz versions of the venerable IEC 60603 7 8P8C RJ 45 connectors which is already widely used in Ethernet 10GBASE T Cables 10GBASE T works up to 55 m 180 ft with existing Catego...

Страница 10: ...d 10 gigabit Ethernet over a laser with 1310 nm wavelength connection on single mode fiber via IEEE 802 3 Clause 49 64B 66B Physical Coding Sub layer PCS using a line rate of 10 3125 Single mode optic...

Страница 11: ...is for receiving and one fiber is for transmitting The picture here is called LC connector that can attach to SFP transceiver Transceiver Connector SFP XFP Transceivers can be plugged into NuStreams...

Страница 12: ...ket installation Steps for installing a Bracket in NuStreams 700 First of all you must have an Empty Slot for the Installation of a Bracket Attach the Bracket s screw end on the internal Chassis screw...

Страница 13: ...ams 700 Aim the border side of a XM RM Module Card with the NuStreams 700 internal slide road and push this Module Card into the NuStreams 700 Please make sure if the XM RM Module Card is well fixed i...

Страница 14: ...the power module of NuStreams 700 Note System Module Cards do not support hot swap and must be installed to their designated slots on NuStreams 700 chassis Measuring Module Cards XM RM661 XM RM671 XM...

Страница 15: ...baud rate for debugging USB Port Reserved LED Sys Yellow ON XM 3S3GS is booting and preparing for test Green ON XM 3S3GS is booting properly and is ready for test Green OFF XM 3S3GS is power off The...

Страница 16: ...treams 700 chassis LED Power Green ON XM 70PW is power on Green OFF XM 70PW is power off Fault Yellow ON XM 70PW is booting and preparing for test or is power on but not operating properly Yellow OFF...

Страница 17: ...r Rate 100 Mbps LED Status SYS Green ON The module card is operating Yellow ON Blinking The module card is updating the Firmware Yellow Green ON Blinking The module card is booting and preparing for t...

Страница 18: ...s LED Status SYS Green ON The module card is operating Yellow ON Blinking The module card is updating the Firmware Yellow Green ON Blinking The module card is booting and preparing for test L A Green...

Страница 19: ...bps LED Status SYS Green ON The module card is operating Yellow ON Blinking The module card is updating the Firmware Yellow Green ON Blinking The module card is booting and preparing for test L A Gree...

Страница 20: ...The module card is operating Yellow ON Blinking The module card is updating the Firmware Yellow Green ON Blinking The module card is booting and preparing for test L A Green ON The port is currently...

Страница 21: ...bps LED Status SYS Green ON The module card is operating Yellow ON Blinking The module card is updating the Firmware Yellow Green ON Blinking The module card is booting and preparing for test L A Gree...

Страница 22: ...ps LED Status SYS Green ON The module card is operating Yellow ON Blinking The module card is updating the Firmware Yellow Green ON Blinking The module card is booting and preparing for test L A Green...

Страница 23: ...Mbps LED Status SYS Green ON The module card is operating Yellow ON Blinking The module card is updating the Firmware Yellow Green ON Blinking The module card is booting and preparing for test L A Gre...

Страница 24: ...s LED Status SYS Green ON The module card is operating Yellow ON Blinking The module card is updating the Firmware Yellow Green ON Blinking The module card is booting and preparing for test L A Green...

Страница 25: ...s LED Status SYS Green ON The module card is operating Yellow ON Blinking The module card is updating the Firmware Yellow Green ON Blinking The module card is booting and preparing for test L A Green...

Страница 26: ...cated virtual control suite for managing NuStreams 700 chassis Each test port can be configured separately with different parameters that define streams filters and capture capabilities With its compr...

Страница 27: ...apabilities provide an effective way to evaluate DUT Throughput Latency Packet Loss and Back to Back under different modes such as One to One One to Many and Many to One Throughput The maximum rate at...

Страница 28: ...ium between frames over a short to medium period of time starting from an idle state With its real time display of the results and various customizable report formats that allow users to view the test...

Страница 29: ...MultiUnits RM supports all XM RM module cards and can reserve the XM RM module card s ports on each testing window where the testing result of each window can be showed separately on a log file The Nu...

Страница 30: ...atency Forward Pressure Address Learning Address Caching and Congestion Control With its real time display of test results and various customizable report formats that allow users to view the test dat...

Отзывы: