![Xtralis ICAM IAS Скачать руководство пользователя страница 23](http://html.mh-extra.com/html/xtralis/icam-ias/icam-ias_commissioning-manual_890664023.webp)
ICAM by Xtralis
ICAM Commissioning Guide
www.xtralis.com
19
Acceptable response times are determined by site requirements, subject to local codes and standards. In the
event the test response times do not meet the acceptable standard the commissioning form should be signed
as NOT ACCEPTABLE and recommendations for further work should be recorded on the commissioning
form.
5.2
Testing Devices
The outputs for the IFT detectors can be tested using a diagnostic test that is accessed through the TEST
OUTPUTS menu function. For more information please see the IFT Product Guide.
5.3
Documenting Test Results
The tests results should be recorded on a copy of the ICAM commissioning forms. Once the forms have been
completed and signed, they should be forwarded along with relevant attachments to all those mentioned in
Chapter 6.
Copies of the commissioning forms are available in the document library at www.xtralis.com (Xtralis
document number 16022).
Содержание ICAM IAS
Страница 1: ...ICAM Commissioning Guide May 2018 Document 14972_02 Part Number 29303 ...
Страница 2: ......
Страница 6: ...ICAM Commissioning Guide ICAM by Xtralis 2 www xtralis com This page is intentionally left blank ...
Страница 8: ...ICAM Commissioning Guide ICAM by Xtralis 4 www xtralis com This page is intentionally left blank ...
Страница 10: ...ICAM Commissioning Guide ICAM by Xtralis 6 www xtralis com This page is intentionally left blank ...
Страница 18: ...ICAM Commissioning Guide ICAM by Xtralis 14 www xtralis com This page is intentionally left blank ...
Страница 24: ...ICAM Commissioning Guide ICAM by Xtralis 20 www xtralis com This page is intentionally left blank ...
Страница 26: ...ICAM Commissioning Guide ICAM by Xtralis 22 www xtralis com This page is intentionally left blank ...