
Industrial PDA
54
menu, do PPPoE dial.
xDSL test flow is:
xDSL line quality test
—
>line exit with power test
—
>PPPoE
Dial
—
>network layer test
—
>application layer test.
Insert telephone line into RJ11 as follows:
xDSL test wiring diagram
Into xDSL test interface, it can show activation
situation, when line activated, it can show the parameter of
Up/down steam channel rate, noise margin, attenuation,
the output power, the number of error codes (CRC, HEC,
FEC, NCD, OCD) and channel bits picture, it can check all
test parameter when sliding screen. Then press PPPoE
dial and input the user name and password, and then do
the landing page test after finishing dialing.
Modem Emulation
Emulate user Modem, and eliminate user Modem.
When click Modem Emulation, it can open the power of
Modem, and show VPI/VCI, please see the following
Содержание XL-DM307G
Страница 1: ...XL DM307G User manual...
Страница 16: ...Industrial PDA 10 5 Structures and Functions...
Страница 45: ...Industrial PDA 39 Long press a window will pop up as bellow...
Страница 67: ...Industrial PDA 61 Click Yes to see current network information Route Test...
Страница 68: ...Industrial PDA 62 Click Yes to check the current web information Traceroute Test...
Страница 78: ...Industrial PDA 72 Click shortcut key F1 or F2 the program selected window is as follows...