4
1 General Information
Read all these instructions & warnings fully before commencing installation.
These installation and operating instructions must be observed during installation, operation, service and
maintenance. This MVHR should only be installed and repaired by a qualified service technician. Improper repairs
may expose the user to considerable danger. Under current regulations, the installation and operating instructions
must be accessible at all times and must be handed to the technician for reference whenever work is being done on
the MVHR. When moving out of the premises this MVHR has been installed in, please pass the instructions on to the
next tenant / owner. Unpack the MVHR carefully and check for any visible signs of damage. If any damage is found
contact the supplier. Only use original spares in order to avoid secondary damage. Please ensure that all packaging
materials are disposed of properly in accordance with current environmental requirements.
2 Components and Materials of Construction
The MVHR comprises of the following main components:
Item
Description
Outer casing:
Powder-coated stainless steel, colour white to RAL 9010.
Access hatch:
PS plastic.
Ducting spigots, Ø 150mm: EPP, black.
Internal air paths and
internal casing:
EPP, black.
Filters:
G4 Filters fitted as standard. An external Air Filter Box with F5 or F7 Filters is also
available as a separate accessory.
Heat Exchanger:
The Heat Exchanger is made from fully recyclable PS plastic. The Heat Exchanger
integrated into the MVHR is based on the counter flow principle with triangular air
ducts for supply and exhaust air.
Fans:
Energy-saving EC DC Fans with optimal efficiency.
Содержание Xcell 400 QV
Страница 10: ...10 5 8 Installation dimensions 5 8 1 Right hand installation ...
Страница 11: ...11 5 8 2 Left hand installation ...
Страница 43: ...43 ...