8
5)
The lift has to fix to the adjustable ceiling mounting bars by using
M8 or
5/16
″
threaded rods. The length of the rods may vary depend on the height of
the ceiling.
6)
The threaded rods must pass through the mounting holes of the lift as well as
adjustable ceiling mounting bars and secure by nuts above and below. (Fig.)
7)
The threaded rods should not extend more than 2' (600mm). If the rods need
to extend more than 2', please use the
cross bracing
to enhance the stability.
8)
Use the threaded locking compound angle nuts to prevent swinging.
9)
Adjust the threaded rods length to get the proper height.
10)
Adjust the nuts at treaded rods to level the lift.
11)
Check that the lift is leveled from front-to-back and side-to-side.
12)
A minimum size of opening on false ceiling is required for the lift to
travel.
XCU 190
XCU 180
Minimum opening ( WXD) 660mm x 660mm
620mm x 620mm
M8 Threaded rod (x4)
M8 nuts (4 nuts per rod)