background image

via Licinio Ferretti 5/A
43126 - Parma (PR) - Italy
Tel. +39.0521.1564103
Mail. [email protected]

www.xlitesrl.it

Il presente documento potrebbe includere inesattezze tecniche che verranno corrette a esclusiva discrezione di XLITE srl 
non appena saranno rilevate. XLITE srl si riserva inoltre il diritto di cambiare i contenuti del documento in qualsiasi momento, 

senza preavviso. Le immagini presentate sono solo a scopo illustrativo e per finalità promozionale. I dati indicati sono 

soggetti a variazioni del ± 10%. Per maggiori informazioni contattare il nostro ufficio tecnico o visitare il sito www.xlitesrl.it

ISTRUZIONI DI INSTALLAZIONE, USO, 
MANUTENZIONE
INSTALLATION, USE, MAINTENANCE 
INSTRUCTIONS

Rev. 2

ENGLISH
!IMPORTANT!

ECO ATEX luminaires are designed to provide illumination of a specific area and must only be installed by authorized, suitably trained and 

qualified personnel and in compliance with the requirements of current standards.

ECO ATEX appliances must be installed away from areas subject to drafts to avoid the accumulation of electrostatic charges.

ECO ATEX luminaires can be fixed to the ceiling or wall surface using compatible accessories. It is the installer’s responsibility to check whether 

the chosen support and fixing system are compatible with the application.

The electrical connection to the ECO ATEX appliance must be made on the push wire terminal block inside the casing on the push-in terminal 
block following the instructions included with the appliance. The connection must be made using a single-pole or multi-pole copper cable with a 
section of 1 mm2 to 2.5 mm2.

Before connecting the power line, make sure that each input is suitably equipped with an Ex certified cable gland or an Ex certified plug.

WARNING: Temporary shipping plugs are not Ex certified plugs and must be removed and replaced with suitable inputs before use.

Important information about the power adapter (ECG)
Neutral conductor interference in a three-phase system can cause overvoltage damage to the lighting system. Open the isolating terminal of the 
neutral conductor only when it is disconnected from the supply and close it before restarting.
Use network cables for dimmable ECG control inputs (DALI, etc.).
Once the appliance is closed, lock the stainless steel closing clips with the screws supplied with the appliance.

The maintenance of ECO ATEX must be carried out by authorized and qualified personnel in accordance with the provisions in force.

Due to the potential electrostatic risk, ECO ATEX appliances must be periodically cleaned using only a damp cloth to avoid the formation of a 
layer of dust.
Any maintenance work inside the device, with the exception of battery replacement, is not permitted and may only be carried out by the 
manufacturer.

For the ET version, once connected to an active ballast, the lamp will start flashing automatically.

For the ET EB version with NiCd cells, take the following steps into account:

The emergency light battery must be charged for 24 hours before commissioning the emergency lighting system.
The integrated LED in the device indicates the load function.

If the specified emergency run time is not reached, the emergency light battery must be replaced.

The battery must be replaced at least every four years.
Use only original batteries supplied by the manufacturer.

Storage and transport of ECO ATEX devices must be carried out in the original packaging, in closed places, free from humidity and away from 
any source of heat or light. It is not permitted to store appliances in an open space, even if the boxes are protected with plastic sheeting or 
similar systems.

ECO ATEX appliances are designed for permanent installation.

WARNING – POTENTIAL RISK OF ELECTROSTATIC CHARGE – CLEAN ONLY WITH A WET CLOTH.

WARNING - DO NOT OPEN IN THE PRESENCE OF AN EXPLOSIVE ATMOSPHERE

WARNING - DO NOT REPLACE THE BATTERY IN THE PRESENCE OF AN EXPLOSIVE ATMOSPHERE

ECO ATEX appliances must be used within the Ta range specified in this manual and in the certificate.

ECO ATEX

Содержание ECO ATEX

Страница 1: ...i sospensione utilizzare idonea catena opportunamente dimensionata Verificare il serraggio delle viti che fissano le varie parti dell apparecchio assicurandosi di avvitare e svitare con sequenza alter...

Страница 2: ...assimo di prodotti alimentabili simultaneamente e alle resistenze chimiche degli stessi contattare i nostri uffici tecnici Per informazioni relative al numero minimo massimo di corpi illuminanti insta...

Страница 3: ...they belong to and the type of use maintenance must be carried out on a scheduled basis In case of suspension use a suitably sized chain Check the tightness of the screws that secure the various part...

Страница 4: ...or information relating to the sizing the distribution of the lighting fixtures the maximum number of products that can be fed simultaneously and their chemical resistance contact our technical office...

Страница 5: ...e pu causare danni dovuti a sovratensione nell impianto di illuminazione Aprire il morsetto di sezionamento del conduttore neutro solo quando scollegato dall alimentazione e chiuderlo prima della riac...

Страница 6: ...dapter ECG Neutral conductor interference in a three phase system can cause overvoltage damage to the lighting system Open the isolating terminal of the neutral conductor only when it is disconnected...

Страница 7: ...XLITE srl si riserva inoltre il diritto di cambiare i contenuti del documento in qualsiasi momento senza preavviso Le immagini presentate sono solo a scopo illustrativo e per finalit promozionale I da...

Отзывы: