5
Ensuring the single steel strip of first vertical rail is adjacent to
post, slot clamp into channel of horizontal at the corner. Close
T-Loc lever to secure and repeat for remaining vertical rails.
6
With steel fixing strip uppermost, slot final 750mm horizontal
profiles onto top of vertical rails and channels of posts. Close
remaining levers to finish assembly of the framework.
Starting from the top left-hand side of the system, unroll the
first graphic panel and align the magnetic tape with the steel
fixing strips of the framework. Work across the frame, taking
care not to crease the graphic panel. Repeat for remaining
graphic panels to complete assembly.
7
4
Slot clamps of each bottom horizontal profile into post
channels and close T-Loc lever to secure.
Содержание Centro 3
Страница 1: ...C e n t r o www xldisplays co uk 01733 511 030 Centro 3 Assembly Instructions ...
Страница 4: ...2019 rA ...