Part Number

 

18143,

 

E, 01/28/2020 

Installation 
 
Installing the Display Unit (P1BR-S01-D/P1CR-S01-D & P2BS-S01D) 
 
The Display Unit should be located at the instrument panel, so that the visible and audible 
indicators may be easily observed.   
 
Drill a 2-

1/16” hole to accommodate 

the P1BR-S01-D/P1CR-S01-D Display Unit. 

Drill a 2-

1/8” hole to accommodate the 

P2BS-S01-D Display Unit. 

 

Insert Display Unit into hole and secure with the provided threaded mounting nut.  A Trim Ring is 
available if needed. 
 

NOTE 

DO NOT MAKE ELECTRICAL CONNECTIONS AT THIS TIME.  THEY WILL BE ADDRESSED IN A LATER 
SECTION. 
 
Installing the Solenoid Valve for LPG Applications 
 
The Solenoid Valve should be mounted on the tank side of the LPG regulator, as close to the tank 
as practical.  The tank itself should be mounted outside the cabin or crew quarters to avoid the 
possibility of gas accumulation due to a leak. 

 

NOTE 

TIGHTEN TO 12-13 FT/LBS. DO NOT OVER-TIGHTEN. 

 

NOTE 

ALL PIPING MUST BE CHECKED FOR LEAKS.  USE SOAPY WATER SOLUTION ON ALL JOINTS.  NEVER 
USE A FLAME TO CHECK FOR LEAKS. 
 
Routing Sensor Cable(s) (FS-

X01 CABLE XX’)

 

 
A 20 FT Sensor Cable is provided for each Propane Fume Sensor.  The Sensor Cables should be 
routed starting at the Display Unit, then to the pre-determined location of the Propane Fume 
Sensor.  Connect to the Display Unit using the attached quick-disconnect connectors.  Take care 
not to pinch, break, or cut the Sensor Cable or put too much stress on the connectors while 
routing the cable.  Secure the Sensor Cable with the appropriate hardware for the application.   
 

NOTE 

DO NOT CUT EXTENSION CABLE FOR ANY PURPOSE.  DOING SO VOIDS THE PRODUCTS 
WARRANTY.  LONGER CABLES ARE AVAILABLE FROM 20 FT TO 100 FT.   
 

 
 

 

Содержание P-1BS-24-R

Страница 1: ...rol 24V Solenoid P 1CS R Chrome Round Solenoid Control 12V Solenoid P 1CS 24 R Chrome Round Solenoid Control 24V Solenoid Dual Channel System P 2BS R Black Square Solenoid Control 12V Solenoid P 2BS 24 R Black Square Solenoid Control 24V Solenoid Owner s Manual Installation Instructions Read and comply with all instructions warnings and limitations before installing servicing or removing this devi...

Страница 2: ...stalling the Display Unit P1BR S01 D P1CR S01 D P2BS S01D 6 Installing the Solenoid Valve for LPG Applications 6 Routing Sensor Cable s FS X01 CABLE XX 6 Installing Propane Fume Sensor s FS T01 7 Electrical Connections P1BR S01 D P1CR S01 D P2BS S01D 7 Testing the System Operation 7 Testing the Propane Fume Sensors 8 Maintenance 8 In the Event of an Alarm 8 Repairing Xintex Propane Detection Compo...

Страница 3: ...he system Specification System Specifications P 1BS R P 1CS R Operating Voltage 9 18V DC Nominal Current Draw 55mA 12V DC Maximum Current Draw 725mA 9V DC Operating Temperature 40 F 40 C to 185 F 85 C Alarm Horn 68 dB System Specifications P 1BS 24 R P 1CS 24 R Operating Voltage 18 30V DC Nominal Current Draw 25mA 24V DC Maximum Current Draw 41mA 18V DC Operating Temperature 40 F 40 C to 185 F 85 ...

Страница 4: ...he bottom indicates a fume buildup of 20 of the LEL Lower Explosive Limit which is considered an alarm The alarm horn will sound when the Red LED is illuminated The alarm horn will actuate Solenoid Valve will close and the Solenoid Valve status LED will deactivate when the Red LED is illuminated Whenever the Solenoid Valve status LED is illuminated the Solenoid Valve is open The alarm status will ...

Страница 5: ...ker 2A May be obtained Display Unit 2A fuse recommended Solenoid Valve YELLOW Switching Ground 2A Fuse Included FS X01 CABLE XX FS T01 FS X01 CABLE XX FS T01 P2BS S01 D RED Power 1 0 Amp Fuse from Circuit Breaker BLACK Ground Solenoid Valve YELLOW Switching Ground 2A Fuse Included Positive voltage From Solenoid Circuit Breaker 2A May be obtained Display Unit 2A fuse recommended ...

Страница 6: ...actical The tank itself should be mounted outside the cabin or crew quarters to avoid the possibility of gas accumulation due to a leak NOTE TIGHTEN TO 12 13 FT LBS DO NOT OVER TIGHTEN NOTE ALL PIPING MUST BE CHECKED FOR LEAKS USE SOAPY WATER SOLUTION ON ALL JOINTS NEVER USE A FLAME TO CHECK FOR LEAKS Routing Sensor Cable s FS X01 CABLE XX A 20 FT Sensor Cable is provided for each Propane Fume Sen...

Страница 7: ...fused Yellow 16 GA wire is provided for connecting the Display Unit to the Solenoid Valve Connect the Yellow wire to the Solenoid Valve Connect the positive voltage to the Solenoid Valve NOTE UNITS MANUFACTURED PRIOR TO JANUARY 01 2018 DO NOT INCLUDE THE 2A FUSE A DEDICATED 2A FUSE OR BREAKER SHOULD BE USED TO POWER THE SOLENOID VALVE NOTE IMPROPER CONNECTIONS WILL DAMAGE THE DISPLAY UNIT AND WILL...

Страница 8: ...engers and crew exit the passenger compartment and vessel if possible Ventilate the space being monitored Carefully check all fuel lines and other potential sources of propane fume leaks If leaks are identified shut off fuel supply and make any necessary repairs Repairing Xintex Propane Fume Detection Components Xintex Propane Fume Detection Components are not field serviceable Components must be ...

Страница 9: ...ment of Fireboy Xintex LLC does not assume the costs of removal and or installation of the product or any other incidental costs of removal and or installation of the product or any other incidental costs which may arise as a result of any defect in material or workmanship and e upon discovery of defect Buyer shall immediately cease use of and notify Fireboy Xintex LLC Any warranty implied by law ...

Отзывы: