as not to affect the operation and daily maintenance, the equipment should be placed firmly, the four feet
should not be suspended, the installation site should not have regular vibration, and serious impact should
not be allowed to occur.
2. Check that each part of the connecting cable is connected correctly.
3. Check that the air path is connected correctly.
4. Operators should be familiar with the operation steps of the equipment and the functions of the switches
before they can operate on the machine, in order to prevent personnel and equipment damage caused by
improper operation.
Operating Steps :
1. Connect air source and waiting for the gas pressure reach to above 0.6 Mpa.
2. Manually place on the cutting die set and fix it.
3. Place acrylic plate on the base, then place coated electrode sheets on the acrylic plate.
4. Rotate the swith to “on” status to start punching, then swith to “off” and then take out the punched
electrode sheet.
Warning: Please do not put your hand and other things into to working area during the punch
process, to avoid injuries and accidents.
Maintenance methods and precautions
:
1. Wipe the dirt on the guide pillar and other moving parts frequently, keep it clean, and lubricate it to keep
it moving smoothly.
2. When the machine is not used, keep oil valve loosened to return the moving template(lower die) to the
initial position. If the machine do not need to use for a long time, take out the upper die and clean it,
then apply oil to keep surface clean and smooth.
3. Regularly check the screws, nuts, pins and other fasteners on all parts of the machine to prevent
looseness, and prevent the quality accidents and personal accidents.
4. During the operation, it is strictly forbidden to put the hand and other body parts to the dangerous place
of the guide pillar, slide plate and working area. Two or more people are not allowed to operate it
together to avoid accidental injury.