HLP106D User Manual
Rev.1.2
10
3.1.4 Ribbon Loading
1.Put the new ribbon into the ribbon supply shaft, and put ribbon supply group into the printing
group.
Figure 3-3
2. Put the empty ribbon core into ribbon pick-up shaft, and put ribbon pick-up group into the
printing group.
Figure 3-4