background image

Xenex Disinfection Services LLC- Confidential and Proprietary Information.

12082017 Original Instructions. 730-00009-02

xenex.com   |   866-867-9799   |   page 4 

POD SET-UP:   

Integrating the LightStrike® Robot

9.    Raise the frame to the tall setting aligning the next set point indicators on the frame. 

(Fig: 2G) 

 

NOTE: 

The tall setting allows the cargo door of the pod to open to a usable height of 86 inches or 7 feet 2 

inches (2.18 meters).

10.    Finish securing the envelope to the frame by wrapping all of the upper Velcro security straps to each 

corner post. There are 6 on the long side of the envelope and 4 on the left side. 

(Fig: 2H)

.  

NOTE: 

The 4 straps at the top may need to be loosened to adjust pod height.

11.    Secure the sewn in storage straps out of the way during use.

 (Fig: 2i&K)

(Fig:2G)

(Fig: 2i)

(Fig: 2H)

(Fig: 2K)

Set Up: Integrating the  

LightStrike® Robot

1.     Unzip the two zippers of the cargo door, located on 

the sides of the door and zip upward from the door 

to the end of the zipper track near the top of the 

Pod

 (Fig: 3A)

2.     On the left side along the bottom edge of the cargo 

door, locate the vertical hook keeper 

(Fig: 3-B)

 and on 

the right side locate the hook 

(Fig: 3-C)

. Folding the 

bottom of the envelope over on itself, push the hook 

through the keeper 

(Fig: 3-D)

 and hang the envelope 

through the “D” ring sewn into the left edge of the 

envelope 

(Fig: 3-E)

NOTE: 

This holds the door 

in an open position during 

loading and unloading 

equipment. You can also 

hang the hook higher up 

on the upper cross truss to 

provide a taller opening.

(Fig:3A)

(Fig: 3B)

(Fig: 3D)

(Fig: 3C)

(Fig: 3E)

Содержание Light Strike

Страница 1: ...Xenex Disinfection Services LLC Confidential and Proprietary Information xenex com 866 867 9799 POD SET UP USE MANUAL...

Страница 2: ...ension The pod envelope comes installed in the recommended storage position on the frame 1 Remove the black velcro storage belt from the LightStrike pod and store it with the cover Fig 1 A 2 Stand wit...

Страница 3: ...eight of 77 inches 6 ft 5 in 1 96 meters 6 Stand facing either end of the Pod and place one foot on the center push plate of the lower truss in front of you Grip your hands around the corner posts and...

Страница 4: ...o adjust pod height 11 Secure the sewn in storage straps out of the way during use Fig 2i K Fig 2G Fig 2i Fig 2H Fig 2K Set Up Integrating the LightStrike Robot 1 Unzip the two zippers of the cargo do...

Страница 5: ...e LightStrike Robot and power it on 8 Load the items to be disinfected Close both zippers by pulling each downward to the floor 9 Place the orange safety cone in front of the Pod and remove a safety s...

Страница 6: ...the 2 lower truss assemblies at each end will cause frame damage if forced If the frame does not easily start to articulate into the closed position STOP Check each of the 4 corner release points and...

Страница 7: ...d finish It also has molded plastic parts The frame weight 39 5 lbs The exterior envelope material is a poly pongee ripstop material The internal material is bonded pure aluminum materialized to the e...

Страница 8: ...nex Disinfection Services LLC Confidential and Proprietary Information 12082017 Original Instructions 730 00009 02 xenex com 866 867 9799 QUESTIONS ABOUT XENEX CONTACT US 866 867 9799 SUPPORT XENEX CO...

Отзывы: