XCell Ion-X
2
Assembly Manual
Created: 8/25/2007
Copyright Miniature Aircraft USA
Page 91 of 123
This document may not be distributed without permission of Miniature Aircraft USA
6B.2 – Assemble/Install Flybar Bell Links
6B.2.a 6B.2.b
Building Notes – snap one end of the
assembled link onto the double ball on
the bell mixer and the other onto the
double ball on the flybar carrier. Repeat
for the other side
The flybar needed for the next step is
located in a separate bag.
6B.3 – Install Flybar
6B.3.a 6B.3.b
6B.3.c
Building Notes – use a piece of tubing or
a straw to help install the flybar correctly.
Cut the straw to length and then slide it
over one end of the flybar. Tighten the set
screws on both sides of the flybar carrier
#0312
#0135
156 mm
#0052