P Series Aircraft Module Wiring Guidelines V1.1
Load system
Power system
GNSS RIK positioning module
Smart battery
XCope system
Terrain sensor
PC upgrading port
SBUS
Liquid
No.2 nozzle
Liquid
No.3 nozzle
Liquid
No.4 nozzle
Liquid
No.1 nozzle
Attention
1. It is forbidden to disassemble and install any modules in
powered state.
2. The power supply can be started only after all modules
are installed.
Right
Front
Rear
Left
r
r
r
Uninterruptible Power Supply
High Data Link Module
Auxiliary Port1
FC Status Indicator
N
N
N
N
Diagram-Infusion Tube
No.3 Arm
No.4 Arm
No.2 Arm
No.1 Arm
Antenna Hub
Central Hub
Flight controller
Power Grid Hub
www.xa.com
13
Quick start guide
Содержание P20 2019
Страница 1: ...en Version 1 0 Quick Start Guide P20 2019 ...
Страница 2: ......