X Training Equipment COMPETITION FREESTANDING RIG Скачать руководство пользователя страница 10

10ft, 20ft, 30ft, and 40ft Rigs will end in the following 6ft wide assembly 

using two Upright Beams, three 6ft Pull-up Bars, and one 6ft Crossbeam. 

Once assembled, tilt up with your partners and bolt to the end of your rig.

STEP FIVE

X Training Equipment • [email protected] • (877) 348-7464

1 2 3 4

6

5

2x

9ft (108”)

Upright Beam

12x

M12 Bolt

24x

M12 Washer

12x

M12 Nuts

Example: 20FT

+

+

6ft Pull-up Bar

6ft Crossbeam

3x

1x

Содержание COMPETITION FREESTANDING RIG

Страница 1: ...FREESTANDING RIG COMPETITION ASSEMBLY GUIDE X Training Equipment support xtraining com 877 348 7464...

Страница 2: ...o your gym we are proud to offer a number of freestanding and wall mounted rig configurations to fit your needs Our rigs are designed to be modular and can be uprgraded or re configured as your busine...

Страница 3: ...aining com 877 348 7464 Three People 19mm Ratchet PARTS GUIDE 19mm Wrench 14mm Concrete Drill Bit Impact Driver 9ft 108 Upright Beam 4ft Pull up Bar J Cup M12 Bolt 14mm Concrete Anchors M12 Washer M12...

Страница 4: ...repencies Upright Beam 10FT 6 2 2 5 3 4FT Pull up Bar 4FT Crossbeam 6FT Pull up Bar 6FT Crossbeam 2 48 J Cup Pair M12 Bolt 96 48 M12 Washer 24 14FT 8 4 4 6 4 4 72 144 72 32 20FT 10 4 4 9 5 4 88 176 88...

Страница 5: ...of each assmebly type is needed based on the rig length ASSEMBLIES X Training Equipment support xtraining com 877 348 7464 10FT ASSEMBLIES NEEDED 14FT 20FT 24FT 30FT 34FT 40FT 44FT 1x 1 2x 1 2x 1 1x...

Страница 6: ...Training Equipment support xtraining com 877 348 7464 1 2 3 4 5 Note Steps 1 2 will be completed horizontally on the ground 4ft Pull up Bar 4ft Crossbeam 16x 2x 2x M12 Bolt 32x M12 Washer 16x M12 Nuts...

Страница 7: ...e together using two 6ft Pull up Bars and two 6ft Crossbeams STEP TWO X Training Equipment support xtraining com 877 348 7464 1 2 3 4 5 6ft Pull up Bar 6ft Crossbeam 8x M12 Bolt 16x 2x 2x M12 Washer 8...

Страница 8: ...efully tilt the rig into it s upright position Repeat Steps One and Two for every Squat Station your rig has See Assemblies page for reference STEP THREE X Training Equipment support xtraining com 877...

Страница 9: ...Squat Stations have been assembled connect them together using 6ft Pull up bars STEP FOUR X Training Equipment support xtraining com 877 348 7464 1 2 3 4 5 6ft Pull up Bar 8x 2x M12 Bolt 16x M12 Washe...

Страница 10: ...ft Pull up Bars and one 6ft Crossbeam Once assembled tilt up with your partners and bolt to the end of your rig STEP FIVE X Training Equipment support xtraining com 877 348 7464 1 2 3 4 6 5 2x 9ft 108...

Страница 11: ...loor using the provided Concrete Anchors This step will vary depending on your structure Contact a qualified contractor for additional help STEP SIX X Training Equipment support xtraining com 877 348...

Страница 12: ...Congrats your Pull up Rig is now complete It is important to check your bolts are securly tightened before every use COMPLETE X Training Equipment support xtraining com 877 348 7464...

Отзывы: