![wtw TresCon UNO A111 Скачать руководство пользователя страница 42](http://html1.mh-extra.com/html/wtw/trescon-uno-a111/trescon-uno-a111_operating-manual_1000694042.webp)
Installation
TresCon UNO
3 - 24
ba43134e08
05/2017
3.6.2
Installing the overflow vessel with valve
The overflow vessel with valve is screwed to the mounting element of
the TresCon UNO instead of the series overflow vessel.
Pre-assembling the
component
Using a piece of Norprene tube (inner diameter 9.5 mm), connect the
overflow vessel and the valve. Place the preassembled components on
the left position of the mounting plate (see Fig. 3-21).
Fig. 3-21 Pre-mounting the TC/ÜB V
Mounting the
component on the
TresCon UNO
1
Remove the lid of the overflow vessel.
2
Screw the overflow vessel and the magnetic valve on the
mounting plate.
3
Close the lid of the overflow vessel.
M5 x 8
M4 x 20
4
Switch off the TresCon UNO.
5
Remove the installed overflow vessel from the mounting ele-
ment.
Содержание TresCon UNO A111
Страница 2: ...2 ba43134e08 05 2017 TresCon UNO Copyright 2017 Xylem Analytics Germany GmbH Printed in Germany...
Страница 6: ...Inhaltsverzeichnis TresCon UNO 0 4 ba43134e08 05 2017 9 1 Abbreviations 9 1 9 2 Index 9 1...
Страница 18: ...Safety TresCon UNO 2 4 ba43134e08 05 2017...
Страница 56: ...Initial commissioning TresCon UNO 4 4 ba43134e08 05 2017...
Страница 133: ...TresCon UNO Operation 5 77 ba43134e08 05 2017 9 Select Yes or No with 68 and confirm with 3...
Страница 167: ...TresCon UNO Maintenance 6 11 ba43134e08 05 2017 6 Leave the menu with 4...
Страница 202: ...Appendix TresCon UNO 8 24 ba43134e08 05 2017...
Страница 207: ......