Original Operating Instructions
BATx0280-ES-1-400-1 (Outdoor)
Installation
O_BATx0280-ES-1-400-1_(Outdoor)_V1.3_GB
Page
41
of
69
3.5.2.5 External Voltage Measurement Device
Required material (not include in scope of delivery):
•
Voltage measuring device
Figure 19: Cable routing terminal strip (-X3)
Procedure:
1.
Locate
the terminal strip (-X3) (Figure 19).
2.
Open
the corresponding cable ducts.
3.
Route
the cables through the cable entry grommet.
4.
Connect
the cables to the terminal strip (-X3):
Phase
L1
on (-X3.11)
Phase
L2
on (-X3.12)
Phase
L3
on (-X3.13)
Neutral conductor
N
on (-X3.14)
5.
Close
cable ducts.
6.
Fix
the cable with a cable clamp.
Содержание BAT 0280-ES-1-400-1 Series
Страница 69: ......