6.
Cover each seams or closures of the suit with soapy water, if leaks are revealed by the
formation of the soap air bubbles, the leak areas should be marked for repairing.
7.
After inspection, close the ball valve, pull out the quick connector of pressure gauge and
charging hose from pressing board, loose the nuts, take out the pressing board, open
the zipper, and take out the stable board.
Please note: Hold the quick connector of pressure gauge and charging hose by
forefinger and thumb, push the connector inside first then you can pull them out from
the pressing board. Release the air pressure slowly in the suit and then hang the suit
to dry.
8.
Wash all tested suits according to the washing mark, avoid dry cleaning or chemicals
for cleaning the suit as the lining may come off if using the wrong solvents for cleaning,
dry it naturally but not in heavy sunshine or in the proximity of heaters or UV supplying
machines. Hang it for drying on a wide stable garment hanger if available.
5.
Open the ball valve slowly and watch the pressure gauge, raise pressure slowly and
close the ball valve when the pressure approaches 1.0 to 1.4 Kpa, then keep the
pressure stable.