background image

 

4

Assembly Frame and Reflector 

1. Face the flat surface of tank bracket outwards. 
2. Insert tank bracket between top reflector bar and reflector frame, at the same time overlapping 

holes. Fasten with the nuts and bolts provided. 
3. Fasten other end of tank bracket to right and left upright supports. 

4. 45º collector angle: fasten diagonal sidebars and bottom sidebars. 
30º collector angle: fasten 4 diagonal sidebars and bottom sidebars. 

5. Attach the 4 feet. 

 

Storage tank assembly 

1. Place tank onto tank bracket cradle, inserting protruding bolts into holes. Fasten with nuts. 

2. Screw the air vent into place. 
NOTE: Leave the nuts loose as some alignment/adjustment may be necessary after fitting tubes. 

 

Unit Mounting Instructions 

 

Mounting on the roof ridge 

The assembled unit should be placed on the roof ridge, move the unit from south to north to adjust 

the collector tilt angle, and ensures that the overflow pipe and inlet/outlet is vertical to the Horizon. 
This is recommended only on roofs with slopes of between 21°and 40°. 

 
Note: Remove diagonal sidebars if ridge cap impedes them. Ensure other attachments can 

compensate for lack of diagonal sidebars. 
 

 
 

 

 

 
 

Mounting on the roof slope 

Determine roof angle. 

Cut the right and left upright supports as specified in tab. 2. 

Check tank is parallel with the ground, inlet/outlet pipes vertical. 

 

Tab. 2 cutting upright supports instructions 

 

Содержание JR-138

Страница 1: ...iple of Operation 3 Assembly Instructions 3 Reflector Assembly 3 Frame Assembly 3 Connecting frame and reflector 4 Storage tank assembly 4 Unit Mounting Instructions 4 Mounting on roof ridge 4 Mountin...

Страница 2: ...diance days The ESWH is available in several sizes depending on your hot water requirements Fig 1 Structure of ESWH 1 Insulation polyurethane foam 2 Inner cylinder AISI 316L 3 Outer shell galvanized s...

Страница 3: ...f ESWH heater can be chosen between 30 or 45 Reflector Assembly 1 Place the module type reflectors side by side 2 Position the base bracket with larger parallel slots at the bottom Overlap the holes w...

Страница 4: ...ent into place NOTE Leave the nuts loose as some alignment adjustment may be necessary after fitting tubes Unit Mounting Instructions Mounting on the roof ridge The assembled unit should be placed on...

Страница 5: ...ils 3 Attach system securely to the roof either by 6 mm steel wires or if ground mounted the frame fastened to metal attachment points not supplied encased in cement blocks dimensions of each block 10...

Страница 6: ...of the heat pipe into the aluminium fin already in the evacuated tube leaving enough of the heat pipe exposed to allow insertion of the heat pipe into the tank and for fastening of the threaded brass...

Страница 7: ...es are covered the heat pipes can get hot enough to cause a burn injury and damage to the heat pipes will occur if the hot end of the pipe contacts cold water Only uncover the glass tubes once the tan...

Страница 8: ...able temperature before showering or bathing 2 JB series solar water heater withstands pressure 0 5 kgf cm 3 The evacuated tubes resist temperatures as low as 70 when the tank is empty Under these con...

Страница 9: ...y does hot water flow intermittently some times When the outflow rate is greater than the inflow the relief valve on the top of tank will open and suck air in the water level inside the tank will then...

Страница 10: ...10 Trouble Shooting...

Отзывы: