background image

WSM U15, U15-3 Service

I-S-15

b. PP (KTC, KCL)-version

* 500 thru 1000 continued to the following table.

No.

Check points

Intervals

Hour meter indicator

Consequently

50

100

150

200

250

300

350

400

450

1

Coolant

check

Daily check

change

every 2 years

2

Fuel

check

Daily check

3

Engine oil

check

Daily check

change

every 500 hrs

4

Hydraulic oil

check

Daily check

change

every 1000 hrs

*1

5

Lubrication points

-

Daily check

6

Radiator and oil cooler

check

Daily check

7

Engine and electrical wiring

check

Daily check

every year

8

Fuel tank, Fuel filter

drain

every 50 hrs

9

Battery condition

check

every 50 hrs

10

Greasing swing bearing teeth

-

every 50 hrs

11

Fan belt tension

adjust

every 200 hrs

12

Radiator hoses and clamps

check

every 200 hrs

replace

every 2 years

13

Air filter element

Outer element

clean

every 200 hrs

*2

@

replace

every 1000 hrs

*2

Inner element

replace

every 1000 hrs

*2

14

Greasing swing ball bearings

-

every 200 hrs

15

Fuel filter element

replace

every 400 hrs

@

16

Engine oil filter

replace

every 500 hrs

17

Drive unit oil

change

every 500 hrs

18

Hydraulic return filter element

replace

every 500 hrs

19

Hydraulic suction filter element

replace

every 1000 hrs

20

Fuel injection nozzle injection 
pressure

check

every 1500 hrs

*4

@

21

Front idler and track roller oil

change

every 2000 hrs

22

Alternator and starter motor

check

every 2000 hrs

23

Injection pump

check

every 3000 hrs

*4

@

24

Radiator system

rinse

every 2 years

25

Fuel line and Intake air line

check

every 200 hrs

@

replace

every 2 years

*3

Содержание Kubota U15

Страница 1: ...WORKSHOP MANUAL KUBOTA EXCAVATOR U15 Code No 97899 61282 Service Chapter U15 3...

Страница 2: ...CONTENTS V Electrical system IV Hydraulic System III Engine II Machine Body I General...

Страница 3: ...ibrations I S 6 b Make Sure the Safety decals and Wireharness Clamps are in their Specified Positions I S 6 c With the Machine Front in a Specified Posture Check the Amount of Hydrauric Oil I S 6 d Pi...

Страница 4: ...ble should occur during use or if servicing is necessary contact the dealer who handles the machine At that time please inform the machine model and engine type and serial numbers Name plate Code No R...

Страница 5: ...propriate space needed for disas sembly to the job 2 Secure a clean safe place for arranging dis assembled parts 3 Store volatile substances gasoline light oil thinner oily articles etc in appropriate...

Страница 6: ...ng 3 Separated parts must be correctly reassembled using alignment marks 4 As a rule use a press to reassembled bearings bushing and oil seals Use pads when using a ham mer e Maintenance CAUTION When...

Страница 7: ...the rotary joints joint direction and shaft set up 3 Installing the swivel base bearing and the swivel motor tightening torque 4 Fitting the pump couplings tightening torque D Important inspection it...

Страница 8: ...e s taper for dust deposits and scratches When the pipe socket has been tightened up wipe the joint clean Apply the maximum operating pres sure 2 or 3 times to make sure there is no oil leak 2 Hydraul...

Страница 9: ...15 0 17 0 108 5 123 0 41 mm 1 61 in Thread size piping screw Tightening torque N m kgf m ft lbf Spanner size reference Remarks Steel pipe OD R tapered thread G straight thread 1 8 19 6 29 4 N m 2 0 3...

Страница 10: ...50 60 RC401 63190 11 32 44 RD411 63820 12 32 51 68311 72830 Steel pipe size O D I D Thickness Tightening torque N m kgf m ft lbf Spanner size reference Remarks 8 6 1 mm 0 31 0 24 0 04 in 29 4 39 2 3 0...

Страница 11: ...12 00 kgf m 75 9 86 8 ft lbf M14 107 9 125 5 N m 11 00 12 80 kgf m 79 6 92 6 ft lbf 123 6 147 1 N m 12 60 15 0 kgf m 91 1 108 5 ft lbf 166 7 196 1 N m 17 00 20 00 kgf m 123 0 144 7 ft lbf M16 166 7 1...

Страница 12: ...G1 2 60 65 N m 6 0 6 5 kgf m 43 47 ft lbs G3 4 118 127 N m 12 0 13 0 kgf m 87 94 ft lbs G1 118 127 N m 12 0 13 0 kgf m 87 94 ft lbs 11 Adhesives 1 Thread adhesive No oil and water allowed on the threa...

Страница 13: ...k hydraulic oil level daily Check fuel level daily Check coolant level daily Lubricate front end attachments daily Checking the radiator and oil cooler daily Check electric cables and connections dail...

Страница 14: ...vel daily Check fuel level daily Check coolant level daily Lubricate front end attachments daily Checking the radiator and oil cooler daily Check electric cables and connections daily Check water sepa...

Страница 15: ...00 Interval Check adjust V belt tension 250 h Check coolant hoses and clamps 250 h Grease pilot valve linkage 250 h Change engine oil and oil filter 500 h Replace the fuel filter 4 500 h Change return...

Страница 16: ...kage 250 h Change engine oil and oil filter 500 h Replace the fuel filter 4 500 h Change return filter for the hydraulic oil tank 3 Please contact your KUBOTA dealer 500 h Replace the drive unit oil 5...

Страница 17: ...lt tension adjust every 200 hrs 12 Radiator hoses and clamps check every 200 hrs replace every 2 years 13 Air filter element Outer element clean every 200 hrs 2 replace every 1000 hrs 2 Inner element...

Страница 18: ...aily check change every 500 hrs 4 Hydraulic oil check Daily check change every 1000 hrs 1 5 Lubrication points Daily check 6 Radiator and oil cooler check Daily check 7 Engine and electrical wiring ch...

Страница 19: ...Thank you very much for your reading Please click here and go back to the website Then you can download the complete manual instantly No waiting...

Отзывы: