Wren Turbines Ltd. MW54 Mk2 & Mk3 Turbo-Jet, kit assembly instructions, Jun 2004
Page 12
Step 9.
Case Front.
Align Case Front over Diffuser – use
the three large holes to position.
Step 10.
Case Front.
Secure with 7 M2.5 x 8mm screws, but
do not tighten up as yet, as we need
to centre the Case Front later.
Step 11.
Aligning Case Front.
Insert (balanced)
Shaft assembly into
Shaft Tunnel – be extra careful when
easing through front bearing.
Step 12.
Aligning Case Front.
Holding the shaft in against the pre-load
spring, insert the front spacer – small
diameter downwards. Do not press hard
as you might “pop” the bearing apart.
Step 13.
Aligning Case Front.
Slide on Compressor and secure with
Compressor Nut – note it has a left-
hand thread.
Step 14.
.
Aligning Case Front.
Fit the Intake Cone onto Case Front,
be careful to align the service cut-outs
correctly.
Step 15.
Aligning Case Front.
Secure Intake Cone with the M2.5 x
6mm screws, temporarily.
Step 16.
Aligning Case Front.
Place NGV with turbine shroud up,
and gently lower assembly into it –
turbine will rest on rim, not the blades.
Содержание MW54 Mk2
Страница 1: ......